background image

Roth CM Manifold System
Installation Instructions

Roth Industries, Inc.                     315-755-1011                     e-mail - [email protected]                    www.roth-america.com 

                  

6

                 

         

Mounting the manifold

Insert bottom ridge of manifold into bracket slots and twist into bracket until top ridge snaps into 

brackets.

Orientation  

The CM manifold can be mounted in any position, however the following conditions may occur 

when manifolds are mounted in positions other than upright (loop tubing approaching from 

bottom):
1.  Upside down position (loop tubing approaching from above)

a. 

Dirt may accumulate in the flow indicators over time. This will not have any effect on the 

flow rate but may cause flow indicators to give false readings or stop working altogether.

b. 

The flow indicators will indicate flow, however they will lose some of their precision in this 

orientation. The flowmeter will indicate 20% less than actual flow.

c.  Air vents must be inverted to operate as intended.

2.  Vertical position (loop tubing approaching from either side)

a. 

Dirt may accumulate in the flow indicators with the same effects as above.

b.  The automatic air vent will not operate. 

Caution: Conditions above do not qualify for warranty replacement. 

Hardware

There are four mounting holes in the bracket set that will accommodate a 1/4” (6mm)
diameter fastener appropriate for the mounting surface material. These can include
wood screws, sheet metal screws or through-bolting as required.

Snap

Содержание CM Manifold

Страница 1: ...Roth Industries Inc 268 Bellew Avenue South Watertown NY 13601 Ph 315 755 1011 Fax 315 475 0200 www roth usa com info roth usa com Roth CM Manifold System Installation Instructions Roth Roth...

Страница 2: ...fold basic kit including Manifold cross pieces Temperature gauges Drain fill valves Mounting brackets Supply manifold segments 1 6 with adjustable flowmeters Return manifold segments 1 6 with manual v...

Страница 3: ...50 70 90 110 130 150 F 30 50 70 90 110 130 150 F Specifications Parameter Value Operating Temperature and Pressure Maximum 140 F 87 psi 60 C 6 bar Maximum 194 F 43 psi 90 C 3 bar Maximum Operating Pre...

Страница 4: ...until they hit the end stop 2 Tee segment has four connection points on top bottom and two sides Each connection has a plug which can be removed with a large slotted screwdriver Ball Valve 1 Ball val...

Страница 5: ...Manifold system locations should not be in flood prone areas or exposed to the elements 4 Avoid exposing tubing to direct sunlight even through a door or window Long term exposure to UV rays will cau...

Страница 6: ...fect on the flow rate but may cause flow indicators to give false readings or stop working altogether b The flow indicators will indicate flow however they will lose some of their precision in this or...

Страница 7: ...amed with Roth Alu Laser Plus reaming tool This puts a bevel on the inside of the pipe and allows the fitting to be inserted into the pipe without disturbing the o rings on the fitting Failure to do s...

Страница 8: ...s Attach service hoses to barbed fittings on supply and return manifold fill drain valves and secure with hose clamps Open fill drain valves Open all loop supply and return main valves Open water sour...

Страница 9: ...nts until water seeps out and close Shut off the water source close fill drain valves and remove service hoses Pressure Testing Air test Pressurize system to 87 psi 6 bar for a minimum of 2 hours Pres...

Страница 10: ...g 1 up and turn flowmeter 2 counterclockwise Once the flow rate is set turn stop ring clockwise until the stop engages the stop on the flowmeter Push the stop ring down to lock 1 2 1 2 3 4 5 6 7 8 9 1...

Отзывы: