Roth CM Manifold Скачать руководство пользователя страница 4

Roth CM Manifold System
Installation Instructions

Roth Industries, Inc.                     315-755-1011                     e-mail - [email protected]                    www.roth-america.com 

                  

4

                 

         

Assembly

Manifold trunk segments

     

1.  Manifold trunk segments have a male and female threaded end. They are connected by 

turning clockwise until they hit the end stop. Segments will automatically line up.

2.  The male end includes an o-ring. Be sure the o-ring is seated properly.

End cap

1.  End caps are connected by turning clockwise until they hit the end stop.

Tee segment

1.  Tee segment has a male threaded end. They are connected to the manifold trunk segment by 

turning clockwise until they hit the end stop.

2.  Tee segment has four connection points on top, bottom, and two sides. Each connection has 

a plug which can be removed with a large slotted screwdriver.

Ball Valve

1.  Ball valve is threaded into the brass union nut on the tee segment. 
2.  Position the handle of the ball valve to desired angle and tighten union nut.

3.  The connection is a metal flat seal. Make sure both flat surfaces are free of debris.

Fill/drain valve

1.  Remove plug in bottom connection on tee.

2.  Thread fill drain valve into tee until snug.

3.  Position valve tee to desired location and tighten union ring on valve until hand tight. 

Temperature gauge

1.  Insert temperature gauge into a connection point on the tee. Do not remove plug.

Pressure gauge 

1.  Remove any plug on tee.
2.  Thread pressure gauge into connection point.

Содержание CM Manifold

Страница 1: ...Roth Industries Inc 268 Bellew Avenue South Watertown NY 13601 Ph 315 755 1011 Fax 315 475 0200 www roth usa com info roth usa com Roth CM Manifold System Installation Instructions Roth Roth...

Страница 2: ...fold basic kit including Manifold cross pieces Temperature gauges Drain fill valves Mounting brackets Supply manifold segments 1 6 with adjustable flowmeters Return manifold segments 1 6 with manual v...

Страница 3: ...50 70 90 110 130 150 F 30 50 70 90 110 130 150 F Specifications Parameter Value Operating Temperature and Pressure Maximum 140 F 87 psi 60 C 6 bar Maximum 194 F 43 psi 90 C 3 bar Maximum Operating Pre...

Страница 4: ...until they hit the end stop 2 Tee segment has four connection points on top bottom and two sides Each connection has a plug which can be removed with a large slotted screwdriver Ball Valve 1 Ball val...

Страница 5: ...Manifold system locations should not be in flood prone areas or exposed to the elements 4 Avoid exposing tubing to direct sunlight even through a door or window Long term exposure to UV rays will cau...

Страница 6: ...fect on the flow rate but may cause flow indicators to give false readings or stop working altogether b The flow indicators will indicate flow however they will lose some of their precision in this or...

Страница 7: ...amed with Roth Alu Laser Plus reaming tool This puts a bevel on the inside of the pipe and allows the fitting to be inserted into the pipe without disturbing the o rings on the fitting Failure to do s...

Страница 8: ...s Attach service hoses to barbed fittings on supply and return manifold fill drain valves and secure with hose clamps Open fill drain valves Open all loop supply and return main valves Open water sour...

Страница 9: ...nts until water seeps out and close Shut off the water source close fill drain valves and remove service hoses Pressure Testing Air test Pressurize system to 87 psi 6 bar for a minimum of 2 hours Pres...

Страница 10: ...g 1 up and turn flowmeter 2 counterclockwise Once the flow rate is set turn stop ring clockwise until the stop engages the stop on the flowmeter Push the stop ring down to lock 1 2 1 2 3 4 5 6 7 8 9 1...

Отзывы: