Operations manual AQUASTOP
®
II
Carl Roth GmbH + Co. KG
19
6.2 Start-up
Attention :
Before switching the unit on, make sure that all
tubing is tightly secured and the flow meter is
mounted in the right direction of the cooling water
stream (see arrow).
After verification of all electrical connections, switch
the coolant monitor on (5). The green light within the
main power switch is now illuminated.
Open then the water tap and adjust the water flow
to the desired flow value shown on the lower line of
the display (1). During 50 seconds after the initial
start-up (or after having pressed the RESET-key
(6) ), AQUASTOP® II is re-initialized and all alarms
are inhibited. This gives you enough time to fill and
adjust the entire installation.
During this period, a circling digit on the display
shows the initialisation phase. Occasional alarms
are only indicated by flashing of the corresponding
LED (4), but do not influence the connected heating
and/or solenoid valve.