3
x
Initial start-up
15
BA ROTEX GSU - 09/2007
3
Start-up
3.1
Safety
The following instructions are especially applicable for transport, erection, installation and initial start-up:
– Lift the ROTEX GasSolarUnit only by the handles provided for the purpose. Lifting or shifting the ROTEX GSU by the panels
can damage the device (see Chapter 3.2).
– The erection surface must be solid, even and horizontal. Install a pedestal if necessary (see Chapter 3.2).
– Observe requirements in relation to installation room (see Chapter 1.5).
– The country's firing ordinance in force and DIN 18160 are valid for the execution and measuring of the flue gas system.
The properties of the flue gas system must be marked on the system (nameplate in the installation room).
– The specialised company carrying out the work must come to an agreement with the district chimney sweep before beginning
the work. We recommend documenting the participation of the district chimney sweeps in a form sheet.
– The electrical connection should only be performed by electrical engineers in compliance with valid standards and guidelines
as well as the specifications of the energy supply company.
– Only heating specialists trained and authorised by the gas or energy supply companies should be allowed to work on gas
systems.
– Carry out gas connection conforming to the technical rules for gas installation as well as the relevant specifications of the
country of destination and the gas supply company.
3.2
Instructions for erection
Scope of delivery
– The ROTEX GSU (turnkey pre-assembled) consisting of solar storage tank, gas condensing boiler with modulating gas burner,
the integrated circulation pump, 3-way switch valve, internal temperature sensors in the device (inflow, return flow, storage
tank, safety group and ball cock.
– The document folder with installation and maintenance instructions, operating manual, installation and training forms
– Optional: Flue gas temperature sensor.
.
Installation versions
The ROTEX GSU is designed basically for
ambient air independent
operation. They are fitted with a concentric flue gas/air
supply connection DN 80/125. ROTEX recommends using the ROTEX GSU in ambient air independent operation. If possible,
choose this installation version!
In the
conditionally ambient-air independent
and
ambient air -dependent
operation modes, the installation room must have
a ventilation opening of at least
150 cm
2
to open air. As such, the installation room will not be assigned the heated building
envelope under the Energy Conservation Ordinance (EnEV), which downgrades the energy rating of the building.
WARNING!
An improperly installed and operated gas condensing boiler can endanger human life and health and its function
can be impaired.
• Installation and start-up of the gas condensing boiler should be carried out only by gas or energy supply
company
authorised and trained heating engineers
.
Incorrect start-up voids the manufacturer's guarantee for the device.
If you have questions, please contact your heating installer or our Technical Customer Support.
WARNING!
The ROTEX GSU is top-heavy in the empty condition and can tip over during transport. This could put persons
in danger or cause damage to the unit.
• Lift the ROTEX GSU carefully, use the handles.
The ROTEX GSU cannot function without central control unit. The control in the correct version must be
ordered and is delivered in a separate package.
Содержание GSU 320
Страница 45: ...x Notes 45 BA ROTEX GSU 09 2007...
Страница 46: ...Notes 46 BA ROTEX GSU 09 2007...