background image

12

Purpose

This procedure establishes the minimum requirements for the lockout of energy that could cause injury to personnel by the 

operation of lifts in need of repair or being serviced. All employees shall comply with this procedure.

Responsibility

The responsibility for assuring that this procedure is followed is binding upon all employees and service personnel from 

outside service companies (i.e., Authorized Rotary Installers, contactors, etc.). All employees shall be instructed in the 

safety significance of the lockout procedure by the facility owner/manager. Each new or transferred employee along with 

visiting outside service personnel shall be instructed by the owner/manager (or assigned designee) in the purpose and use 

of the lockout procedure.

Preparation

Employees authorized to perform lockout shall ensure that the appropriate energy isolating device (i.e., circuit breaker, 

fuse, disconnect, etc.) is identified for the lift being locked out. Other such devices for other equipment may be located 

in close proximity of the appropriate energy isolating device. If the identity of the device is in question, see the shop 

supervisor for resolution. Assure that proper authorization is received prior to performing the lockout procedure.

Sequence of Lockout Procedure

1)  Notify all affected employees that a lockout is being performed and the reason for it.

2)  Unload the subject lift. Shut it down and assure the disconnect switch is “OFF” if one is provided on the lift.

3)  The authorized lockout person operates the main energy isolation device removing power to the subject lift.

• 

If this is a lockable device, the authorized lockout person places the assigned padlock on the device to 

prevent its unintentional reactivation. An appropriate tag is applied stating the person’s name, at least 3” 

x 6” in size, an easily noticeably color, and states not to operate device or remove tag.

• 

If this device is a non-lockable circuit breaker or fuse, replace with a “dummy” device and tag it 

appropriately as mentioned above.

4)  Attempt to operate lift to assure the lockout is working. Be sure to return any switches to the “OFF” position.

5)  The equipment is now locked out and ready for the required maintenance or service.

Restoring Equipment to Service

1)  Assure the work on the lift is complete and the area is clear of tools, vehicles, and personnel.

2)  At this point, the authorized person can remove the lock (or dummy circuit breaker or fuse) & tag and activate 

the energy isolating device so that the lift may again be placed into operation.

Rules for Using Lockout Procedure

Use the Lockout Procedure whenever the lift is being repaired or serviced, waiting for repair when current operation could 

cause possible injury to personnel, or for any other situation when unintentional operation could injure personnel. No 

attempt shall be made to operate the lift when the energy isolating device is locked out.

LIFT LOCKOUT/TAGOUT PROCEDURE

Lift is not intended for outdoor use and has an operating ambient temperature range of 41º-104ºF (5º-40ºC).

OPERATING CONDITIONS

Содержание MCH418

Страница 1: ...418 MCH618 Four Post Six Post Mobile Column Lift 24V DC Powered June 2015 by Vehicle Service Group All rights reserved CO9304 4 IN20540 Rev G 6 12 2015 MCH418 Capacity 72 000 lbs MCH618 Capacity 108 0...

Страница 2: ...rent batteries meeting the below specifications may be used but performance can vary Recommended Battery Specifications 12V DC Sealed Deep Cycle Battery Size 31 Frame Group 105 AH Capacity At 20 AH Ra...

Страница 3: ...approval from structural engineer Upon completion of the assembly of the lift the lift is to be operated to assure proper function Observe for locks operating in all locking positions each side lifts...

Страница 4: ...e manufacturer s operating instructions ALI SM 93 1 ALI Lifting it Right safety manual ALI ST 90 ALI Safety Tips card ANSI ALI ALOIM 2000 American National Standard for Automotive Lifts Safety Require...

Страница 5: ...Control Panel and the bus diagram as a reference see graphic above press the Activate Column Button relative to the location where the column was just placed The column will show Green when activated...

Страница 6: ...S DO NOT RUN CABLES IN EXIT PATH OF AUTOMOBILE Communication Cable DO NOT RUN CABLES IN EXIT PATH OF AUTOMOBILE Communication Cable Fig 3 Fig 4 Fig 2 NOTE Ensure Communication Cables are clear of fork...

Страница 7: ...that the System Configuration Lock Unlock light is green press the Raise Button to raise lifts off the locks B Press the Lower Button to lower lift The Slow Lower Button 1 3 speed can be used if desi...

Страница 8: ...column with an error Operating Instruction Details Options Changing the System Configuration Columns may only be added to or removed from a system by unlocking the existing configuration and then con...

Страница 9: ...ORKING IN THE VICINITY OF A LEAD ACID BATTERY IS DANGEROUS BATTERIES CONTAIN SULFURIC ACID AND PRODUCE EXPLOSIVE GASES A BATTERY EXPLOSION COULD RESULT IN LOSS OF EYESIGHT OR SERIOUS BURNS FOR THIS RE...

Страница 10: ...1 Lower lift check oil level in oil tanks on each column Open Power Unit Cover Remove oil cap and check oil level It should just be touching the dipstick If necessary fill with ISOVG32 hydraulic oil...

Страница 11: ...nger be guaranteed Follow manual lowering procedures E7 Short circuit detected A short has been detected in the lift actuators Press x to clear To determine the faulty component run the faulty column...

Страница 12: ...nect switch is OFF if one is provided on the lift 3 The authorized lockout person operates the main energy isolation device removing power to the subject lift If this is a lockable device the authoriz...

Страница 13: ...nal See Supplemental Diagram String NP932 Rev A AC in 230 V 2 2A 1 50Hz Battery Charger RS485 Comm Pot Contactors Red Black Black Red White Blue Black 1 White Black 2 Red Red Black Red Black Black Red...

Страница 14: ...14 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 15: ...15 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 16: ...e to lift owner operator Thank You Trained Operators and Regular Maintenance Ensures Satisfactory Performance of Your Rotary Lift Contact Your Nearest Authorized Rotary Parts Distributor for Genuine R...

Отзывы: