SRG-4400 User Manual (Iss. 06)
Physical Installation • 2–7
Installing the Breakout PCB on the Rack Tray
You will need a Phillips screwdriver to affix the Breakout PCB to the rack tray using the four M3
10mm screws that were included in the SRG-4400 Install Kit.
For More Information on...
• installing the rear support brackets into the rack frame, refer to the section “
To install the Breakout PCB on the rack tray
1.
Position the Breakout PCB atop the screw posts on the tray. Refer to
.
Figure 2.2
Installing the Breakout PCB on the Rack Tray
2.
Affix the Breakout PCB using the provided four M310mm screws with lock washers
(88-0095).
Installing the Breakout PCB into the Rack Frame
The Tray installs between the rear support brackets so that the 30-pin connector is aligned with
the
BALANCED
30-pin connector on the SRG-4400 rear panel. This section outlines how to
affix the tray to the rear support brackets.
To install the Breakout PCB in the rack frame
1.
Position the Breakout PCB and Tray behind the SRG-4400 in the rack frame (
) while ensuring to:
• position the Breakout PCB so that its white 30-pin connector is aligned with the
SRG-4400 rear panel 30pin connectors;
• leave enough space between the SRG-4400 rear panel and the Breakout PCB to
properly cable the connectors.
TRA
Y
PCB
Содержание SRG-4400
Страница 1: ...SRG 4400 Master Reference and Test Signal Generator User Manual...
Страница 8: ......
Страница 54: ...4 10 Operating Basics SRG 4400 User Manual Iss 06...
Страница 116: ...5 62 Menu System SRG 4400 User Manual Iss 06...
Страница 140: ...8 4 Certifications and Compliances SRG 4400 User Manual Iss 06...
Страница 146: ...9 6 Connector Pinouts SRG 4400 User Manual Iss 06...
Страница 164: ...11 14 Test Patterns SRG 4400 User Manual Iss 06...
Страница 168: ...12 4 Connecting via DashBoard SRG 4400 User Manual Iss 06...
Страница 186: ...14 12 GPS Option SRG 4400 User Manual Iss 06...