SRG-4400 User Manual (Iss. 06)
Physical Installation • 2–3
Initial Product Inspection
Perform the following Initial Product Inspection Procedure when you receive your SRG-4400:
1.
Inspect the shipping carton for external damage, which may indicate possible damage to
the SRG-4400. If damage exists, document it, including photographs, to support any
insurance claim.
2.
Remove the instrument from the shipping carton.
3.
Check that the SRG-4400 has not been damaged in transit. The exterior should not have
any scratches or impact marks. Prior to shipment the SRG-4400 is thoroughly inspected
for mechanical defects.
4.
Verify that the shipping carton contains the instrument, the standard accessories, and any
optional accessories that you ordered.
5.
Perform the Functional Check Procedures as outlined in the chapter “
” on page 3-1 after installing the SRG-4400.
Note
— Save the shipping carton and packaging materials for SRG-4400 re-packaging in
case return shipment becomes necessary.
Содержание SRG-4400
Страница 1: ...SRG 4400 Master Reference and Test Signal Generator User Manual...
Страница 8: ......
Страница 54: ...4 10 Operating Basics SRG 4400 User Manual Iss 06...
Страница 116: ...5 62 Menu System SRG 4400 User Manual Iss 06...
Страница 140: ...8 4 Certifications and Compliances SRG 4400 User Manual Iss 06...
Страница 146: ...9 6 Connector Pinouts SRG 4400 User Manual Iss 06...
Страница 164: ...11 14 Test Patterns SRG 4400 User Manual Iss 06...
Страница 168: ...12 4 Connecting via DashBoard SRG 4400 User Manual Iss 06...
Страница 186: ...14 12 GPS Option SRG 4400 User Manual Iss 06...