© 2017 CHARLES ROSS & SON COMPANY
4
INITIAL INSPECTION
When your ROSS Mixer arrives, inspect the packaging/crating prior to accepting from the shipper for signs of
possible damage during transit. Inspect all packing slips and bills of lading to ensure that all listed parts
boxes or packages have been delivered with the shipment.
Since all shipments are normally shipped FOB the ROSS factory, any damage or loss is the responsibility of
the carrier and should be reported to them immediately. If the terms of the sale are FOB destination, and
there is damage, contact your ROSS representative or the factory immediately. E-Mail/Fax or Mail a copy of
the inspection report and the delivery receipt indicating the problem areas at the time of delivery to:
Charles Ross & Company
710 Old Willets Path
P.O. Box 12308
Hauppauge, NY 11788
Phone (631)-234-0500
Fax (631)-234-0691
www.mixers.com
Carefully uncrate the machinery. Do not discard the shipping crate or any packing materials until the contents
of the crate/box have been carefully compared with the shipping documents. If any material is unsatisfactory
or missing, notify Charles Ross and Son Company at the above address and phone/fax numbers.
Rental machinery must be returned in its original and reusable packaging or crating to avoid additional
charges. Mark/tag the original crating and store in a secure area.
Содержание CDA-10
Страница 18: ...2017 CHARLES ROSS SON COMPANY 18 SIDE VIEW CDA 10...
Страница 19: ...2017 CHARLES ROSS SON COMPANY 19 VACUUM COVER BEARING HOUSING VIEW CDA 10...
Страница 20: ...2017 CHARLES ROSS SON COMPANY 20 HSD BLADE VIEW CDA 10...
Страница 21: ...2017 CHARLES ROSS SON COMPANY 21 MIX CAN VIEW CDA 10...
Страница 22: ...2017 CHARLES ROSS SON COMPANY 22 THERMOCOUPLE ASSEMBLY LOW PROFILE 1 8 FLUSH MOUNT...
Страница 23: ...2017 CHARLES ROSS SON COMPANY 23 APPENDIX VENDOR PRODUCT INFORMATION...