4
Startup
The Leak Detection System must be installed and fully commissioned by qualified
Rosemount
™
personnel prior to customer operation.
1.
Turn the unit isolator switch (shown below) to the
ON
position.
Once power has been started, the system takes approximately two minutes to boot.
Isolation Switches
Figure 4-1:
2.
Ensure the compressed air supply is open.
3.
When production begins, turn the blower isolator to the ON position.
NOTICE
Emerson
™
recommends that the blower is switched off when the production line is not
running. This will extend the lifetime of the sample air filter.
4.
Press the Reset button on the front of the console and ensure there is a green light
on the beacon.
Startup
Reference Manual
17
Содержание CT4215
Страница 1: ...Reference Manual 00809 0100 4245 Rev AB July 2018 Rosemount CT4215 Leak Detection System ...
Страница 12: ...Contents ii Rosemount CT4215 ...
Страница 22: ...Line Installation Location Figure 3 1 Ground Fixing Figure 3 2 Installation 10 Rosemount CT4215 ...
Страница 28: ...Installation 16 Rosemount CT4215 ...
Страница 30: ...Startup 18 Rosemount CT4215 ...
Страница 44: ...Operation 32 Rosemount CT4215 ...
Страница 50: ...Maintenance 38 Rosemount CT4215 ...
Страница 54: ...Troubleshooting and diagnostics 42 Rosemount CT4215 ...