background image

Assembly Instructions

Round-Top Walk-In Coop

Model 2 V1 2022

Copyright ® Roost & Root all rights reserved.  

Parts ID - Roost Inner 

Wall

Page

07

… here we go!

A stock set of storm
panels are provided
for these 2 doors...

Looking From Inside 

Coop

Wire stapled to Interior

side of panel

2X

C1

C2

C3

Beveled Top Edge

Find shipping 
screw in door 
frames that keep 
doors closed 
during transport 
and remove 
them.

Содержание Round-Top Walk-In Coop 2

Страница 1: ...ll rights reserved This document is intellectual property of Roost Root and is being provided to you for your own personal limited use as a paying customer for the purpose of assembling your coop Roost Root claims all available Federal protection for the name Round Top Coop our protected designs and trade dress as is allowed by any and all Federal intellectual property protection laws We invest he...

Страница 2: ... 2 V1 2022 Copyright Roost Root all rights reserved Orientation Page 01 Front Back Right We recommend having the right side of your coop facing North in winter weather intense locations Left Waterer Roost Area Egg Boxes Turn Out Door Run Roof Run Door ...

Страница 3: ...yright Roost Root all rights reserved Overall Dimensions Page 02 9 2 8 3 1 2 2 2 5 8 7 5 1 2 9 11 5 8 14 0 2 2 3 4 6 3 1 2 Exterior measurements are to the outside edges of the ground foot print Ground contact panels are 1 inches wide Waterer Feeders Sun Room Option ...

Страница 4: ...culled during milling cutting and in fabrication about 5 10 does not make the cut Knots blemishes fraying coloring variations minor surface cracking slight warping and periodic worm marks are normal parts of natural wood products We try to make it to where a reversible part always has a pretty side and take care to make the pretty side show on all parts If you re unhappy with a piece of wood we fa...

Страница 5: ... determiner of sharp edges A standard metal file from your hardware store or metal snips can be used to make edges to your standards You may choose to wear a pair of work gloves while handling roof metal Be careful not to get caught in coop Children should not play in coop as the doors are not designed to allow easy exit Spending the time up front to identify all the parts and lay them all out wil...

Страница 6: ...atch 2 Eye Bolt Hooks 100 Neoprene Washer Roof Screws 1 Bit Holder 1 T 25 Bit 1 T 20 Bit 1 2 Phillips Bit 2 12 Stake Nails 1 2 Level 1 Countersink Bit 1 1 8 Jobber Drill Bit 1 10 Feet of String 12 5 8 Phillips Screws for Ramps 12 1 1 4 Flat Head Phillips Screws For Door 2 Snap Clips 2 Stock Storm Panels for Roost Doors 1 Gravity Gate Latch 6 1 T 20 Yellow Screws Optionally your kit may have the fo...

Страница 7: ...ound Top Walk In Coop Model 2 V1 2022 Copyright Roost Root all rights reserved Parts ID Front Back Run Walls Page 06 Step 1 is a little time to identify parts Front Wall Back Wall 2X A1 Door A2 A4 Front Arc D1 D2 Back Arc A3 ...

Страница 8: ...eserved Parts ID Roost Inner Wall Page 07 here we go A stock set of storm panels are provided for these 2 doors Looking From Inside Coop Wire stapled to Interior side of panel 2X C1 C2 C3 Beveled Top Edge Find shipping screw in door frames that keep doors closed during transport and remove them ...

Страница 9: ... Roost Root all rights reserved Parts ID Roost Front Back Page 08 Door opening fits a Standard sized automatic turnout door from www chickendoors com G1 G2 Back of Coop Wire to the Inside Roost Bar Support Bracket Front of Coop 11 x 15 Chicken Door Facing outside of coop ...

Страница 10: ...ssembly Instructions Round Top Walk In Coop Model 2 V1 2022 Copyright Roost Root all rights reserved Parts ID Roost Outer Wall Page 09 Looking From Outside Coop Wire On Backside Beveled Top Edge G3 G4 2X ...

Страница 11: ...op Walk In Coop Model 2 V1 2022 Copyright Roost Root all rights reserved Parts ID Roost Parts Page 10 G5 Roost Bars 4X G8 Roost Ramp Supports 2X G9 Mid Roost Bar Support G7 Roost Ramp Landing G6 Longer Ramp G6 Upper Ramp 2X Hinges ...

Страница 12: ...nd Top Walk In Coop Model 2 V1 2022 Copyright Roost Root all rights reserved Parts ID Roost Roof Parts Page 11 G13 Roost Roof Metal G11 Eave Boards G12 Roof Supports G13 With Trimmed Edge is for the lower Roost section 2X 3X 3X ...

Страница 13: ...s Round Top Walk In Coop Model 2 V1 2022 Copyright Roost Root all rights reserved Parts ID Egg Box Inner Wall Page 12 B1 B4 B5 Wire Side Beveled Top Edge Looking From Inside Coop B2 B3 2X 2X Two Sets of this Perch Assembly ...

Страница 14: ...mbly Instructions Round Top Walk In Coop Model 2 V1 2022 Copyright Roost Root all rights reserved Parts ID Egg Box Front Back Page 13 Wire Side In Back of Coop Front of Coop F2 F1 Hole For Optional Waterer ...

Страница 15: ...Walk In Coop Model 2 V1 2022 Copyright Roost Root all rights reserved Parts ID Egg Box Inner Parts Page 14 Magnets F4 Inner Divider F3 Outer Divider F5 Egg Box Floor F6 Feeder Bracket For Optional Feeders Everything illustrated is 2X ...

Страница 16: ...ssembly Instructions Round Top Walk In Coop Model 2 V1 2022 Copyright Roost Root all rights reserved Parts ID Egg Box Outer Wall Page 15 Beveled Top Edges Looking From Outside Coop Wire to Back F7 F8 2X ...

Страница 17: ...ound Top Walk In Coop Model 2 V1 2022 Copyright Roost Root all rights reserved Parts ID Egg Box Roof Parts Page 16 Lipped Edge Pointed towards Center F11 Roof Metal F12 Feeder Area Roof Magnet F9 Eave F10 Eave Beveled Edge 2X ...

Страница 18: ...t Roost Root all rights reserved Parts ID Run Roof Parts Page 17 6 piece set noted by red green and yellow stickers 6 equal length roof metal sections E2 Roof Supports 2X E3 Eaves Magnet Magnet 2 Sets of 3 Beveled Top Edges E4 Galvalume Roof Metal Panels E1 Mid Arc 6X 6X ...

Страница 19: ... Top Walk In Coop Model 2 V1 2022 Copyright Roost Root all rights reserved Parts ID Optional Feeders Waterer Page 18 Y2 Optional Feeders 4 Y3 Waterer Brackets 2 Y1 Optional Waterer delivered in 2 sections Standard Poultry Nipples ...

Страница 20: ...ck View Start With The End in Mind The start of each section has an illustration of what you ll end up with after that section is complete Not our quote but we like it Build on level ground Finished coop will weigh 800 pounds and is not designed to be moved without at least partial disassembly This is what you re about to build Section 1 Run Area ...

Страница 21: ...0 B2 Panels 25 High B2 Panels 25 High D1 A2 on outside of B2 s Blue numbered circles indicate the order of assembly T25 Bit Bit Holder T25 3 Inch Screw Your Drill Included Included Included Gold arrows indicate a T25 3 Screw and its direction Wire Side In Flush Tops Back of Coop 1 2 Wire Side Faces In B2 B2 B3 D1 A2 Front of Coop 3 Your Measure Tape ...

Страница 22: ...check other side of board or panel If our shop goofed and they re missing we include a pilot bit to make your own Flush Tops Back of Coop Front of Coop Open Doors To Access Screw Holes 4 1 Wire In C1 2 3 5 C1 C3 A3 D1 As with the egg box left side assembly make sure panels A2 and D1 are on the outside of the C panels in areas of red circles Gold arrows indicate a T25 Screw and its direction ...

Страница 23: ... Step 1C Joining Roost and Egg Box Sides Page 22 Temporarily place to about 27 apart Okay got it Back of Coop Front of Coop Flush Tops Using provided level check what you have built so far on all sides and adjust soil and contact points as needed Gold arrows indicate a T25 Screw and its direction 1 2 3 ...

Страница 24: ...structions Round Top Walk In Coop Model 2 V1 2022 Copyright Roost Root all rights reserved Step 1D Upper Egg Box Panels Page 23 Bevel Slant Down Out Front of Coop 1 2 Wire Facing In on B1 s Flush Tops B1 B1 3 4 5 ...

Страница 25: ...opyright Roost Root all rights reserved Step 1E Upper Run Roost Side Page 24 Back of Coop 5 Front of Coop 1 Open C1 Doors to Access Screws Wire Side facing out Wire Side Faces In Bevel Top Slopes Down Out Access These Two Screws From Other Side C1 C1 C2 C2 6 3 2 4 ...

Страница 26: ...ches lock into A3 and D2 notches E1 4 After connecting E2 halves slide down into place locking notches into A3 D2 arcs E1 mid roof stabilizer slides up from under E2 s to lock into place Fit best way its reversible Use 2 of the Long T25 Gold Screws D2 4X E2 s Assemble E2 s as straight as possible One trick would be to use the provided string stretched along its length after first screw and make it...

Страница 27: ...established in step 1 4 27 Inches Measure inside corner to corner and adjust coop until equal this is called squaring and is critical for remainder of steps Pick exact points to measure from Make as equal as possible 4 Door Side Stakes Adjust Door Width When everything is great hammer door stakes into pre drilled holes to pin door width into place Use your measuring tape in step 1 2 Use your hamme...

Страница 28: ...olored stickers as indicated X indicates hole pattern These 6 panels are the slightly shorter ones Identify the 6 run roof panels and their features V ribs point up Double Bottom Boards Arrows point to back of coop T 20 Screw 1 B1 Middle eave board centered Repeat pattern both sides 2 3 Beveled Edge Up LB Left Back LF Left Front MB Middle Back MF Middle Front RB Right Back RF Right Front X X X X X...

Страница 29: ...ickers point towards back of coop Leave all screws loose at this point Once all panels are slipped in you ll tighten everything Overhang Both Ends 1 or a little more Being careful not to shift pieces install a roof screw in positions as indicated by blue arrows to hold two panels in place Try not to shift anything by leaning against it Leave screws very loose Again being careful not to shift piece...

Страница 30: ...ure entire length of roof section is aligned nicely install two lower bottom edge roof screws into front eave edge Tighten only enough to compress neoprene rubber washer try not to over tighten Drill remaining two holes using same considerations as in previous step and install and tighten screws Tighten screws along the left side center panels to where the neoprene rubber washer is compressed and ...

Страница 31: ...his after this step is complete if you ordered an XL model with a Sunroom XL Sunroom is completed after main coop assembly Section 2 Instructions going forward will omit some complexity as HOPEFULLY we did a good job laying some common foundations and you are catching on to the techniques and our lingo You can always call our support hotline at 877 741 2667 or text your questions and photos to 512...

Страница 32: ...ost Side Sub Assembly Page 31 Eave ends overhang about each end See next page if you ordered sunroom option Repeat Back Side Wire Out Bottoms Flush Bottoms Flush G3 G3 G4 G4 G1 G2 1 2 3 4 5 5 6 6 Install Center G11 eave first then the outer eaves Beveled edge of eaves will be flush with top of beveled edge of G4 ...

Страница 33: ...Roost Side Sun Room Support Page 32 Front Skip Page If You Did Not Order XL Sunroom Option Support panel in place of G3 s G3 s will get used in Sunroom Centered See Sun Room addendum for completion of Sunroom after main coop is completed Illustrated without sunroom option for remainder of instructions Right Side ...

Страница 34: ...d poke out the back wall The G12 roof supports are held in place with 1 of the 3 inch screws in each end We pre drill the holes at angels to approximate the angle of the G12 supports The bottom end of the outer G12 s centers on the mid post of the G4 Panels and the middle G12 centers on the middle See red arrows Tops of G12 s are flush with the eave tops Using a helper to hold the G12 steady for y...

Страница 35: ...installed through a combination of reaching through the roost access doors from inside the roost area and standing outside the coop Place roost bars with notches towards outside and facing up Place G8 Roost Ramp Supports In Roost Bar Notches 5 E5 Screw G7 Landing rests on support on C3 panel Screw into place from outside C3 and G3 panels as illustrated Attach G6 ramps shorter ones to both G8 suppo...

Страница 36: ...p front panel up against the side of the coop C2 panels align the pre drilled holes along the right edge up with the center of the roost front wall G1 panel and overlap V Grooves on the TB panel Loosely screw in upper left corner Using your drill and the small provided bit drill through both pieces of roof metal at the indicated positions trying not to drill too deep into the tops of the G12 suppo...

Страница 37: ...me drilling and setting of a roof screw learned in previous steps use the holes in the TF panel to drill into the underneath panel s and add a roof screw into each of the positions as illustrated Tighten all screws firmly just until the rubber washer is compressed Try not to crush the rubber washer G2 Slide the BF panel over top of BB panel up and under the TB TF panels until the single V in the b...

Страница 38: ...Assembly Instructions Round Top Walk In Coop Model 2 V1 2022 Copyright Roost Root all rights reserved Section 3 Eggbox Assembly Page 37 Section 3 ...

Страница 39: ...hts reserved Step 3A Egg Box Sub Assembly Page 38 Attach F7 s to F8 1 3 Wire to Inside Cutout for optional waterer will have wire over it if you did not get waterer Flush Flush Bottoms F1 F2 F7 F7 F8 Attach F7 to F1 panel making sure to keep all edges flush Do the same process for F2 Flush ...

Страница 40: ...ve dog eared corner that faces down There are 2 lefts and 2 rights that are mirrored sets of each other B4 Roost Bar gets captured into B5 brackets during assembly The Day Roost Bars attach under the F5 panels in the positions as indicated with the bars being captured between mirrored brackets Using the 4 long GRK screws and the T25 torx bit install a mirrored set of the brackets with the B4 bar c...

Страница 41: ...k In Coop Model 2 V1 2022 Copyright Roost Root all rights reserved Step 3C Attach Egg Box Sub Assembly Install Dividers Page 40 Make Flush 1 Carefully slide egg box sub assembly into place and attach on both front and back to run section ...

Страница 42: ...force fit may be required and screwed into place using 3 T25 and 1 5 8 T20 screws as indicated by corresponding arrows Back edge sticks up slightly higher to accommodate eave in next step F3 F3 F4L F4R 3 T25 Screw 1 5 8 T20 Screw First install screws from the outside as indicated Then from the inside as illustrated in the callout illustration Drop upper feeder bracket into place as illustrated and...

Страница 43: ...he positions shown using T25 Screws short part of bracket to front of roost section and flush with egg box panels Slide in assembled waterer to where it hangs from brackets and nipples face down Install optional water brackets feeders Panels hidden for clarity Tip smear glue evenly only on the male section insert and turn a little to aligned position Wipe off excess glue with rag and let dry for 1...

Страница 44: ...eders and is held in place by magnets Force up against edge of coop Screw in place with back edge flush the 2 F3 outer eave boards and the inner F3 eave boards Make sure magnets in F10 face up 1 Screw down both F9 outer roof panels with folded lip to the inside using roof screws as indicated Make sure you are screwing into the supports 2 F11 Lipped Edge Out F11 F12 F10 F9 ...

Страница 45: ...east 2 3 screws and tighten Large Pan Head Screw Use large pan head screws to install gate latch where pin slides freely into and releases freely from catch hole in door handle Pre Drill holes if needed 2 Install hinges in predrilled holes using flat head Philips Screws 1 Flat Head Screw Bit 4 An extra hook and eye set is provided if you want to install inside of coop 2 ...

Страница 46: ... 2 V1 2022 Copyright Roost Root all rights reserved Step 3H Turn Out Door Page 45 Small Pan Head Screw Using small pan head screws install latch as illustrated Find shipping screw in door frame that keeps door closed during transport and remove it 1 2 ...

Страница 47: ...onal Freeze Guard Nipples they must be removed to completely remove the waterer Digging Predators Due to varied terrain around the country we do not propose only one method of protecting from digging predators Call if you have questions and we can help you decide on the best method if it is something you are concerned about We have great articles on this topic in the blog section of our website If...

Отзывы: