Assembly Instructions
Round-Top Walk-In Coop
Model 2 V1 2022
Copyright ® Roost & Root all rights reserved.
Step 2A - Roost Side
Sub-Assembly
Page
31
Eave ends
overhang
about ½"
each end.
See next page
if you ordered
sunroom option.
Repeat Back Side
Wire Out
Bottoms Flush
Bottoms Flush
G3
G3
G4
G4
G1
G2
1
2
3
4
55
6
6
Install Center
G11
eave first,
then the outer eaves. Beveled
edge of eaves will be flush with
top of beveled edge of
G4.