background image

Product Overview

SecuriCharge Intelligent EV Charging Unit

EVSM-V01-R1 Installation and Operation Manual

Page 

5

of 

33

December 2022

NOTE: 

The United Kingdom has introduced new regulations (SI 2021/1467) that apply to domestic 

and private EV chargepoints, and which aligns them with other ‘Smart’ appliances.
The new regulations are, amongst other things, designed to balance demands for power and to 

deliver an efficient use of power across the country whilst maintaining a consistent and secure 

service to EV drivers, when and where they need it.
The regulations are an ongoing, multi-part undertaking which may bring additional requirements 

in the coming months and years.

About ‘Smart’ Services

Chargepoints are to be ‘Smart’ enabled. 
‘Smart’ encompasses a large number of requirements but in summary these are:

x

Connected to a ‘charging application’ such as VendElectric.

x

The ability to receive remote, online software updates.

x

Capable of measuring the power used and the power delivered, and the associated 

time periods.

x

Capable of storing and displaying data about charge sessions to the owner and/or 

user, via an application and/or on the chargepoint.

x

Capable of communication with the power supplier and able to adjust the delivery of 

power in response to commands issued by the supplier.

x

Capable of charging even in the event of communications with the network being 

lost. Data recorded about the charge session will be communicated at the next 

available opportunity.

x

The ability to use other charging networks (that meet the Smart requirements).

x

The ability to receive power from any electricity supplier.

x

Incorporates off-peak charging as the default with the ability to override if required.

x

Randomised delay between initiating a charge session and the charge session 

actually starting. This is to prevent overloads of the electricity system if a large number 

of chargepoints are activated the moment the off-peak period starts.

x

Physical and digital protection of data and of the components used to access that 

data.

x

Physical protection of electrical components within the chargepoint to prevent 

personal harm and to prevent accidental or malicious tampering.

Содержание SecuriCharge ROLEC0111B

Страница 1: ...INSTALLATION OPERATION MANUAL Manufactured in the UK SECURICHARGE Intelligent EV charging unit...

Страница 2: ...e text images and all technical content contained within Content supplied by third parties partner organisations remains the property of that organisation and is used by agreement with the supplier Ro...

Страница 3: ...tion 9 Unpacking 14 Standard Contents 14 Options and Accessories 14 Labelling 15 Installation 16 BEFORE Installation 16 Schematics 18 Install the Chargepoint 20 Install Load Balancing 22 Overview 22 C...

Страница 4: ...x Do NOT modify the equipment unless specifically instructed to do so by the manufacturer x Do NOT attempt to repair the equipment unless specifically instructed to do so by the manufacturer x To mai...

Страница 5: ...up to 22kW 3PH Type 2 Socket Black ROLEC0113G SecuriCharge Intelligent EV Charging Unit 1x up to 22kW 3PH Type 2 Socket Grey ROLEC0113W SecuriCharge Intelligent EV Charging Unit 1x up to 22kW 3PH Type...

Страница 6: ...he associated time periods x Capable of storing and displaying data about charge sessions to the owner and or user via an application and or on the chargepoint x Capable of communication with the powe...

Страница 7: ...t 60 Amps the fuse will operate and cut all power to the property if a draw of 60 Amps is exceeded It can be relatively easy to draw significant power if several property appliances are in use at the...

Страница 8: ...balancing in that the power made available for charging can be dynamically adjusted to decrease or increase the power available in response to other demands for power at the property The significant...

Страница 9: ...e vehicle allowing charging to resume x Overvoltage An overvoltage condition is potentially more likely to damage the vehicle so for safety reasons automatic recovery following an overvoltage is NOT p...

Страница 10: ...ecember 2022 Product Specification Figure 1 General Arrangement and Dimensions Single and Double Socket Models Charging Socket LED Halo Status Indicator Charging Sockets Access Panel External Antenna...

Страница 11: ...022 Page 10 of 33 Figure 2 Internal Components Typical Locations RFID Sensor EV Charge Controller for socket 1 Front Layer socket 2 Rear Layer Socket 1 Smart Communications Module Right hand Side Pane...

Страница 12: ...Communications Module CANBUS Connector Connection to Anti Tamper Devices SD Card Location RJ45 LAN Connector Connection to RFID Board USB Connector Figure 4 Smart Com GPRS Antenna Connection SIM Card...

Страница 13: ...0Hz Black ROLEC0111B Grey ROLEC0111G White ROLEC0111W 2x Type 2 IEC 62196 charging sockets Up to 7 4kW 32A per socket 1x 63A Single Phase 230V AC 10 50 60Hz Black ROLEC0121B Grey ROLEC0121G White ROLE...

Страница 14: ...mental x Ingress protection Enclosure IP66 Socket IP54 x Impact protection IK10 x Security Dual tamper breach notifications optional in some units x Operating temperature 30 C to 50 C x Operating humi...

Страница 15: ...do so NOTE Items damaged in transit must first be reported to the courier and then to the supplier Where possible photographic evidence of package and or unit damage should be supplied NOTE Incorrect...

Страница 16: ...duct Rating and Serial Number Label Figure 6 Configuration Tag Back and Front Figure 7 Socket ID Label Figure 8 Instructions and RFID Label Figure 9 Typical Socket Type and power Rating Labels NOTES 1...

Страница 17: ...lready been verified by the end user installer prior to installation x Units using mobile networks require a suitable signal of 14 CSQ or better x Units using Wi Fi connectivity require a strong stabl...

Страница 18: ...int is NOT recommended 4 Obtain fixings suitable to mount the chargepoint in the chosen location x The holes for mounting the enclosure are pre made at 6 mm diameter 5 Make sure that the chargepoint a...

Страница 19: ...TUS INDICATOR LEAD HEADER FRONT VIEW 2xWHITE CABLES HEADER FRONT VIEW OPTIONAL LOAD BALANCING CT TO BE CONNECTED TO A CT FITTED AROUND THE INCOMING SUPPLY LIVE WIRE WHITE CABLE PP B A BLUE GROUND N 1...

Страница 20: ...1 N T LIVE NEUTRAL EARTH INCOMING SUPPLY RED CABLE CP RED SUPPLY HL BLACK SUPPLY HL WHITE HIN N E CP PP L1 L2 L3 kWh 1000 imp kWh 230V 0 25 5 100 A B N N 24 25 23 23 A 25 B 24 G HALO LED STATUS INDICA...

Страница 21: ...efer to the manufacturer s instructions 1 Remove and retain the fixings that secure the front fascia of the unit to the rear enclosure 2 Remove the front fascia and place it to one side x Take care no...

Страница 22: ...stem Refer to page 22 Install Load Balancing shown immediately after these standard installation instructions 10 When Load Balancing has been installed return to this point 11 Route the incoming cable...

Страница 23: ...Transformer CT that clamps around the property s incoming power cable and is then connected to the chargepoint x The CT has a cable allowing it to be connected to the chargepoint x Additional cable m...

Страница 24: ...thin a CAT cable are indicated by their matching colours Do NOT use conductors of different colours interference may be induced Connect the CT Cable to the Chargepoint IMPORTANT A suitable cable gland...

Страница 25: ...o make the connection to the earth terminal x Make sure the CT s earth cable is connected securely to the incoming earth terminal Configure Load Balancing Configuration of the load balancing system is...

Страница 26: ...hone with a camera QR code reader software and Bluetooth connectivity will be required to complete configuration Start Configuration 4 Search the appropriate Apple or Google App store for Rolec EV Con...

Страница 27: ...ces or from Google Play for Android devices x The application is also accessible on almost any device with a web browser https app vendelectric com 3 Discuss an appropriate maintenance plan with the c...

Страница 28: ...on x Make sure the chargepoint has been installed in compliance with the current Electrical Wiring Regulations including recommended earthing arrangements 3 Fit the fascia panel s to the enclosure and...

Страница 29: ...Flashing green light Ready for Standard Charging Fixed blue light Cable plugged in but not charging Fixed green light Charge in progress Fixed red light Potential earth leak fault detected by the 6mA...

Страница 30: ...Peak Hours 8am 11am and 4pm 10pm on weekdays x All hours outside of those shown above are classed as Off Peak End a Charging Session 1 A charging session can be ended by any of the following methods...

Страница 31: ...cable must be unplugged on a regular basis allowing the connectors to be checked for damage or contamination CAUTION Equipment Damage Socket chargepoints include a cable locking device Hatch Lock to...

Страница 32: ...equired more regularly than other maintenance tasks CAUTION Equipment Damage To avoid damage to the surface finish and or internal components do NOT use x Abrasive materials x Mineral or petroleum sol...

Страница 33: ...ate the warranty About Software Updates Software updates can be required for many different reasons such as enhancing security to provide compatibility with new models of electric vehicle or to meet n...

Страница 34: ...Status Indicators operating and displaying correct status x If installed check the condition of the charging socket contacts and socket flap x If installed make sure the access cable lock is operation...

Страница 35: ......

Страница 36: ...HOUT NOTICE The latest version of this publication can be downloaded at https www rolecserv com downloads ev charging Illustrations of the product and user interface are for marketing purposes only Br...

Отзывы: