Installation
SecuriCharge Intelligent EV Charging Unit
EVSM-V01-R1 Installation and Operation Manual
Page
21
of
33
December 2022
6. Carefully lift the chargepoint up to the mounting point and insert the fixings.
x
Make sure the front facia is supported.
x
If using the supplied fixings, make each hole 55mm deep with a 8mm masonry
drill.
x
The fixing points in the chargepoint enclosure are 5mm diameter.
7. Tighten the fixings gradually, making sure the chargepoint remains level.
8. If required, apply sealant to the fixings inside the unit to maintain the IP rating of the
enclosure.
NOTE:
All electrical work must be performed in accordance with the current Electrical
Wiring Regulations.
CAUTION; Equipment Damage – Sensitive Equipment
If you will be performing insulation resistance tests on the power supply cables, it is
advised to be done BEFORE connecting the cable to the chargepoint. The high
voltages applied during the test may damage sensitive components if tested after
the cable is connected.
IMPORTANT:
If load balancing is required, install it alongside the next steps, before
completing the standard installation.
9. If required, install the optional Load Balancing system. Refer to
page 22 Install Load
Balancing
shown immediately after these ‘standard’ installation instructions.
10. When Load Balancing has been installed, return to this point.
11. Route the incoming cables through the enclosure, ready to connect to the
appropriate terminals within the enclosure.
12. Terminate the supply cable in the appropriate manner and connect it to the
chargepoint.
13. If required, connect the Ethernet cable to the Smart Communications Module.
14. Make sure ALL debris is removed from the enclosure and that no debris is present
on any of the components.
NOTE:
Debris and similar pollutants can adversely affect the performance and
working life expectancy of components and will invalidate the product/component
warranty.
IMPORTANT:
It is the responsibility of the installing engineer to satisfy themselves, that all accessible
cable terminations throughout this product are secure and have not become loose,
strained, or disconnected during transit and/or installation.
15. Switch ON the power to the chargepoint and test in accordance with the current
legislation applicable in the geographical region of the installation.
16. Make sure you are satisfied that the electrical installation is complete then, if
required, temporarily close the chargepoint enclosure for safety and security.
Access to the components will be needed during the configuration process.