21
2.Installation
2. Installation
About Placement and Installation Work ...................................................................... 22
Deciding On an Installation Site ..................................................................................... 22
Temperature and Humidity .............................................................................................. 23
Installation Space ................................................................................................................. 23
Air Ventilation ........................................................................................................................ 23
Checks before Operations ................................................................................................. 24
Step 1: Assemble the Stand and Mount the Machine on the Stand .................. 25
Step 2: Attach the Media Holders ................................................................................... 28
Step 3: Install the Drain Bottle ......................................................................................... 30
Step 4: Remove and Store the Retainers ...................................................................... 33
Step 5: Attach the Label ..................................................................................................... 34
Step 6: Connect the Power Cord and the Cable ........................................................ 34
Step 7: Set the Language and the Units ....................................................................... 36
Step 8: Fill the Machine with Ink ..................................................................................... 37
Step 1: Assemble the Cutting Tool ................................................................................. 41
Step 2: Install the Cutting Tool ......................................................................................... 42
Step 1: Make the Network Settings for the Computer ............................................ 44
Step 2: Make the Network Settings on the Printer ................................................... 47
Step 3: Make the Port Settings for the Software RIP ................................................ 49
Содержание VersaUV LEC2-300
Страница 19: ...17 1 Introduction 1 Introduction 1 About the User s Manuals for This Machine 18 2 Checking Included Items 19...
Страница 54: ...52 2 Installation 5 Installation of Ventilating Equipment...
Страница 55: ...53 3 Appendix 3 Appendix Location of the Power Rating and Serial Number Label 54 Specifications 55...