Periodic Maintenance
37
3. Maintenance
Running In the Spindle (Warm-up)
To stabilize the rotation of the spindle, a spindle run-in (warm-up) may be needed.
Cases Where You Need to Perform This Task
When you finish installing the machine
When the spindle unit is replaced
When the machine is not used for a prolonged period
Before you start using the machine in low room temperature
Procedure
Close the front cover and turn on the power.
Show VPanel.
In the top window of VPanel, select the machine
to operate.
Click the radio button to the left of the name of
the machine
to operate.
Click
.
The [Settings] screen will appear.
Click the [Maintenance] tab.
Click [Spindle run-in].
Click [OK].
Spindle run-in starts.
"Spindle run-in is completed" is displayed.
Содержание DWX-51D
Страница 64: ...R2 160616 FA01061 ...