background image

ROLA-CHEM

®

  Flowcell                            PN 550182           7/11/2019                             page: 4 of 8 

Check that sufficient tubing (supplied) is available for connecting Flowcell prior to drilling 
holes. Additional tubing may be obtained –see parts list for part numbers.  
Do not exceed a total of 40' of tubing.  

 

Select installation points in the Pool Circulation System for the fitting that will provide flow 
into the Flowcell. The inlet to the Flowcell should be at a higher pressure than outlet of the 
Flowcell to provide flow though the Flowcell. Assuming the inlet connector will be located 
upstream of the pool filter and the outlet connector will be located downstream from the 
pool filter, proceed as follow: 
 

Cut a length of black plastic tubing long enough to reach from the left (inlet) 
Flowcell Valve to the installation point on the upstream side of the pool filter.   
Install this piece of tubing into the left Valve of Flowcell.  (Turn this Valve 'off.')

 

 
Cut a length of black plastic tubing long enough to reach from the right (outlet) 
Flowcell fitting to the installation point on downstream side of the pool filter.   
Install this piece of tubing into the right Valve of Flowcell.  (Turn this Valve 'off.')  

 
A length of tube can also be added to the center Flowcell Valve for convenience of water 
sampling.

 

 

 

Drill and tap a 1/4" NPT thread into a straight section of water pipe at both installation 
points. 

  

Screw in 1/4" MNPT x TUBE fitting and tighten. 
Note: use Teflon

 tape on pipe threads and 

DO NOT OVER TIGHTEN.

  

Connect the tubes coming from the Flowcell Valves into the fittings. 
  
Open both the left and right Valves on the Flowcell (close the center Valve).  
Turn on the Pool's pump system and check for water leaks.  Fix leaks as required. 
If flow is backwards, the Float will not move up. Reverse the tubes if needed.

 

 
Connect the two Probe cables to controller.  The pH Probe cable connects to the mating 
jack on the bottom of the controller labeled "pH."  Push the connector onto the jack and 
turn clockwise about 1/4 turn.  The ORP Probe cable connects to the mating jack on the 
bottom of the controller labeled "ORP."  

 

3.4 Connect Flow Switch 

Although the Float is an integral part of the flow switch, it is visible through Flowcell wall 
and may also be used as a manual flow indicator. On Controllers with a flow switch 
feature, connect the two lead wires as specified in the Controller manual. 

 

3.5 Connect Grounding/

Bonding

 Stud 

The Flowcell is supplied with a titanium grounding/bonding stud. It is recommended that 
this stud be used to ground/bond the Flowcell process water to earth ground. 
Grounding/bonding the Flowcell helps to eliminate ground loop problems that could 
potentially damage probes and/or cause erroneous readings. 

Содержание GLOBE FLOWCELL

Страница 1: ...ROLA CHEM Flowcell PN 550182 7 11 2019 page 1 of 8 GLOBE FLOWCELL Operating Manual...

Страница 2: ...r from circulating pump must also remove power from the controller Provide a properly located outlet controlled by the circulating pump circuit 1 3 WARNING Use a device such as a flow switch to remove...

Страница 3: ...jar cap Remove the jar cap and grommet from the probe Save for future probe storage Close left and right Flowcell valves and open the center Flowcell valve Remove nuts from probe fittings and slide on...

Страница 4: ...water sampling Drill and tap a 1 4 NPT thread into a straight section of water pipe at both installation points Screw in 1 4 MNPT x TUBE fitting and tighten Note use Teflon tape on pipe threads and D...

Страница 5: ...flushing filter to prevent damage to probes 5 Maintenance 5 1 Cleaning Periodically approx every month remove Probes from Flowcell and clean them using cotton swab or cloth Clean more frequently as re...

Страница 6: ...0 mV Note It may take three to five minutes for Probes to respond to solution If it takes longer you should replace the Probes 6 1 3 Adjust flowrate through Flowcell Incorrect ORP pH reading can occur...

Страница 7: ...IPTION 2 1 1 550209 FLOW SWITCH 550183 3 2 FLOWCELL ASSEMBLY 3 8 TUBE INCLUDES 3 1 THRU 3 6 550180 3 FLOWCELL CLEAR GLOBE 550181 3 1 VALVE SHUT OFF PVC 3 8 TUBE X 1 4 NPT qty 3 7125190 3 4 3 5 550194...

Страница 8: ...duty probes are warranted from the date of original purchase for one 1 year Standard duty probes are warranted from the date of original purchase for 90 days ROLA CHEM under no circumstances shall be...

Отзывы: