`
42.
Click on the connection Tab and remove the inhibit or uncheck the box. Click on the Apply button.
43.
Then Click on the OK Button. Verify you are still on line with the processor and that you are in Run.
44.
Use the PF525 routine to test the drive performance. The external I/O Push Buttons are wired to the PLC so they will
respond to Start > Stop Commands
45.
Change the speed reference which may appear with a value of 0 or something like12.45 hertz in this screen shot.
See rung 0
Page
58
of
64
Содержание Allen-Bradley PowerFlex 525
Страница 1: ...Network Enabled PowerFlex 525 Commissioning Lab ...
Страница 5: ...About the Demo Boxes 1769 L35e Demo Switch Start Stop 1769 L43 Demo Stop Start Switch Page 5 of 64 ...
Страница 8: ... Control and Navigation Keys Page 8 of 64 ...
Страница 37: ...Page 37 of 64 ...
Страница 41: ...When prompted Click No When prompted Click No Page 41 of 64 ...
Страница 64: ... Page 64 of 64 ...