Rockwell Automation Publication 1512A-UM101B-EN-P - December 2021
29
Chapter 3 Installation – Arc-Resistant
Figure 18 - Label on Arc Resistant Door
The top right MV door must be securely fastened for the isolation switch
handle to move to the ON position. All MV doors must be securely bolted closed
before the ArcShield latch handles are rotated.
Only rotate the arc latching handle when the locking bolts are tightened (refer
to
). The arc latching mechanism can be damaged by forcing the arc
latching handle.
Anchoring
Place the controller in the desired installation location. Use M12 (1/2 in.) floor
mounting bolts to securely fasten the controller to the mounting surface. See
as an example of the location of the mounting holes in the cabinet.
ATTENTION:
Do not over tighten the bolts.
ATTENTION:
Power Lockout Procedure on page 43
before
beginning any service procedures to the unit. Failure to do so can result in
severe burns, injury, or death.
Refer to Dimension Drawing provided with order documentation
for additional details that are related to cabinet floor plan.
Содержание Allen-Bradley CENTERLINE 600
Страница 6: ...6 Rockwell Automation Publication 1512A UM101B EN P December 2021 Notes ...
Страница 12: ...12 Rockwell Automation Publication 1512A UM101B EN P December 2021 Chapter 1 General Information Notes ...
Страница 26: ...26 Rockwell Automation Publication 1512A UM101B EN P December 2021 Chapter 2 Installation Standard Enclosure ...
Страница 38: ...38 Rockwell Automation Publication 1512A UM101B EN P December 2021 Chapter 3 Installation Arc Resistant Notes ...
Страница 45: ...Rockwell Automation Publication 1512A UM101B EN P December 2021 45 Chapter 4 Common Installation ...
Страница 72: ...72 Rockwell Automation Publication 1512A UM101B EN P December 2021 Chapter 6 Spare Parts Notes ...
Страница 108: ...108 Rockwell Automation Publication 1512A UM101B EN P December 2021 Index Notes ...