Rockwell Automation Publication 1512A-UM101B-EN-P - December 2021
83
Appendix B ArcShield Plenum Installation Instructions
The plenums are designed to fit over the fastener heads at the four corners of
the relief vent. The corner fasteners are required to secure the relief vent
during installation.
Plenum Placement on Structure
After lifting the plenum in to place, directly over the relief vent (see
).
Reinstall all 1/4-20 fasteners (12 lb•ft [15N•m]), which were removed in
and attach the plenum to the top of the enclosure. Use
hand tools only.
Figure 67 - Typical Relief Vent Fasteners (top view)
Figure 68 - Relief Vent
Relief vent
Relief fasteners
Lifting Angle
Hardware Location
Corner Fasteners - DO NOT REMOVE
Содержание Allen-Bradley CENTERLINE 600
Страница 6: ...6 Rockwell Automation Publication 1512A UM101B EN P December 2021 Notes ...
Страница 12: ...12 Rockwell Automation Publication 1512A UM101B EN P December 2021 Chapter 1 General Information Notes ...
Страница 26: ...26 Rockwell Automation Publication 1512A UM101B EN P December 2021 Chapter 2 Installation Standard Enclosure ...
Страница 38: ...38 Rockwell Automation Publication 1512A UM101B EN P December 2021 Chapter 3 Installation Arc Resistant Notes ...
Страница 45: ...Rockwell Automation Publication 1512A UM101B EN P December 2021 45 Chapter 4 Common Installation ...
Страница 72: ...72 Rockwell Automation Publication 1512A UM101B EN P December 2021 Chapter 6 Spare Parts Notes ...
Страница 108: ...108 Rockwell Automation Publication 1512A UM101B EN P December 2021 Index Notes ...