![Rockwell Automation Allen-Bradley CENTERLINE 2500 Скачать руководство пользователя страница 76](http://html1.mh-extra.com/html/rockwell-automation/allen-bradley-centerline-2500/allen-bradley-centerline-2500_instruction-manual_1475204076.webp)
Publication 2500-IN001A-EN-P - May 2006
9-2
Motor Control Center Options
Figure 9.1 Installing Terminating Resistors and DeviceNet Splicing Cables
Joining DeviceNet Cables
1.
After the terminating resistors have been installed, DeviceNet cables in
each column of the network must be spliced together.
2.
Locate the DeviceNet splicing cable in the top horizontal wireway. One
end of the splicing cable will be plugged into the right DeviceNet port
in the column to the left of the splice.
3.
Route the cable through the top horizontal wireway into the column to
the right of the splice.
4.
Plug the free end of the DeviceNet splicing cable into the left port in the
top horizontal wireway of the column to the right of the splice.
5.
Torque connector screws on the splicing cable plugs to 0.55 N-m.
6.
Ensure the horizontal wireway is free of tools and debris.
7.
Replace horizontal wireway covers.
Terminating Resistor
Splice
Splice
Terminating Resistor
Содержание Allen-Bradley CENTERLINE 2500
Страница 1: ...CENTERLINE 2500 Low Voltage Motor Control Centers Instruction Manual...
Страница 3: ...Instruction Manual CENTERLINE 2500 Motor Control Centers...
Страница 4: ......
Страница 10: ...Publication 2500 IN001A EN P May 2006 iv Notes...
Страница 18: ...Publication 2500 IN001A EN P May 2006 1 8 General Information Notes...
Страница 22: ...Publication 2500 IN001A EN P May 2006 2 4 Transporting Motor Control Centers Notes...
Страница 52: ...Publication 2500 IN001A EN P May 2006 5 12 Commissioning Notes...
Страница 82: ...Publication 2500 IN001A EN P May 2006 10 6 Maintenance Notes...
Страница 84: ...Publication 2500 IN001A EN P May 2006 11 2 Maintenance After Fault Condition Notes...
Страница 86: ...Publication 2500 IN001A EN P May 2006 12 2 Renewal Parts Notes...
Страница 87: ......