Publication 2500-IN001A-EN-P - May 2006
Installation of Columns
3-7
Joining and Splicing
Locating the Bus Splice Kits
After joining columns, power bus splice kits (main horizontal bus and neutral
bus, if required) and protective earth conductor (PE) splice kits must be
installed. Power bus splice kits, if required, are located within a horizontal
wireway or blank unit space. A fluorescent pink, removable label (on the
outside of the column) designates the location. PE splice kits are located in the
bottom horizontal wireway, fastened to the horizontal PE conductor.
Locate
the splice kits and set aside for later use.
Figure 3.5 Splice Kit Label
ATTENTION
To prevent severe injury or death, de-energize all power
sources to the MCC before joining and splicing columns.
Follow local codes and guidelines in addition to the
requirements of EN 50110.
Содержание Allen-Bradley CENTERLINE 2500
Страница 1: ...CENTERLINE 2500 Low Voltage Motor Control Centers Instruction Manual...
Страница 3: ...Instruction Manual CENTERLINE 2500 Motor Control Centers...
Страница 4: ......
Страница 10: ...Publication 2500 IN001A EN P May 2006 iv Notes...
Страница 18: ...Publication 2500 IN001A EN P May 2006 1 8 General Information Notes...
Страница 22: ...Publication 2500 IN001A EN P May 2006 2 4 Transporting Motor Control Centers Notes...
Страница 52: ...Publication 2500 IN001A EN P May 2006 5 12 Commissioning Notes...
Страница 82: ...Publication 2500 IN001A EN P May 2006 10 6 Maintenance Notes...
Страница 84: ...Publication 2500 IN001A EN P May 2006 11 2 Maintenance After Fault Condition Notes...
Страница 86: ...Publication 2500 IN001A EN P May 2006 12 2 Renewal Parts Notes...
Страница 87: ......