background image

 

_____________________________________________________________________________________________ 

© Rocket Espresso Ltd.  RE series   User Manual Ed. 07.2015.  Specifications subject to change without notice..                      Page   7

  

 
Installation 

 

The espresso machine Rocket RE series is to be installed to comply with the applicable 
federal,  state  or  local  plumbing  codes  having  jurisdiction  exclusively  by  authorised 
technical service. 

 

All machines are designed to ensure maximum possible user safety. It is, however, an 
important  responsibility  of  the  user  to  observe  the  following  safety  codes  to  further 
enhance safe installation and operation. 

 

1.

 

Always  ensure  that  hazardous  packing  items  such  as  plastic  bags,  Styrofoam, 
nails,  etc.  are  properly  disposed  of  to  prevent  accidental  injury  to  children  or 
other persons. 

 

2.

 

If  there  is  evidence  of  defect  or  damage  to  the  machine  an  authorised  Rocket 
Espresso  Ltd.  dealer  or  technician  should  be  notified  immediately  so  that 
remedial action can be taken. 

 

3.

 

This  machine  is  safe  only  when  it  has  been  correctly  connected  to  an  efficient 
earthing/grounding  system.  This  should  conform  to  local  safety  standards  and 
legislation in force at the time of installation. 

 

4.

 

Installation  of  any  Rocket  Espresso  Ltd.  product  should  only  be  undertaken  by 
duly authorised, properly trained and qualified personnel 

 

5.

 

Protect  the  user  by  fitting  a  circuit  breaker  to  electric  supply  feeding  the 
machine. 

 

6.

 

A  residual  current  device  (RCD)  having  a  rated  residual  operating  current  not 
exceeding 30mA must be installed. 

 

7.

 

The machines with electrical input over 16 A, must be connected to a net with 
impedance = or < than 0,37 Ω. 

 

8.

 

Dangerous  or  improper  electrical  connections  are  extremely  hazardous  and 
should never occur. 

 

9.

 

Always  check  the  integrity  of  the  component  content  of  the  machine.  Never  fit 
defective or damaged spare parts. Always request replacement spare parts from 
Rocket Espresso Ltd. 

 

10.

 

Before connecting the machine to electric supply, always check that capacity and 
power rating at least equals the power requirement of the machine. 

 

11.

 

The machine has to operate with clean soft drinking water. Never attempt to run 
the machine with water that is harder than 7°F. The manufacturer recommends 
use of an in line filter. 

 

12.

 

Check the efficiency of the machine’s water drain. Drain tray is located under the 
drip tray 

 

13.

 

This  equipment  must  be  installed  on  a  flat,  level  and  stable  surface.  The 
minimum height of this surface is 1025 mm 

 

14.

 

Handle the machine with care.  

 
 

Содержание RE A2

Страница 1: ..._______________________________ Rocket Espresso Ltd RE series User Manual Ed 07 2015 Specifications subject to change without notice Page 1 User Instructions Rocket RE A and RE S Espresso Machines RE A 2 3 4 brewing heads RE S 2 3 4 brewing heads From serial C1507 ...

Страница 2: ...rtion control 11 Start up 12 Operation RE A series with automatic portion control 13 Brewing espresso 13 Dispensing hot water 14 Operation RE S series with semi automatic portion control 15 Brewing espresso 15 Dispensing hot water 16 Dispensing steam to froth or heat up liquids 16 Turning off the machine 17 Proper care and maintenance 18 Disassembling dismantling of the machine 20 Programming auto...

Страница 3: ...rol Rocket Espresso RE A4 4 brewing groups with automatic portion control Rocket Espresso RE S2 2 brewing groups with semi automatic portion control Rocket Espresso RE S3 3 brewing groups with semi automatic portion control Rocket Espresso RE S4 4 brewing groups with semi automatic portion control The machines come with User instructions 1 one cup filter handle 1 one cup metal filter basket 1 blin...

Страница 4: ...to the machine and or its packaging The manual provides information that is current at the time of publication The information is subject to amendment or alteration without notice Installation should only be carried out by technicians and service providers authorised by Rocket Espresso Ltd To ensure maximum performance efficiency it is essential that technical service and maintenance is carried ou...

Страница 5: ...se handle or knobs Coffee brewing groups metal pipes spouts steam and hot water valves and wands metal part of filter holders are hot and will cause burns 8 Never hold your hands under the brewing group the filter handle and the steam and hot water wands Hot drinks hot steam and hot water are dispensed 9 The machine should not be operated with temperatures lower than 6 C and hotter than 36 C 10 Do...

Страница 6: ...or other than intended use 29 Before any cleaning or maintenance the machine should be disconnected from the electric supply 30 When cleaning the machine never use caustic or abrasive cleaning chemicals 31 To ensure efficient and correct operation it is essential to follow the manufacturer s instructions concerning the periodic maintenance carried out by the authorized service technician 32 When t...

Страница 7: ...lation in force at the time of installation 4 Installation of any Rocket Espresso Ltd product should only be undertaken by duly authorised properly trained and qualified personnel 5 Protect the user by fitting a circuit breaker to electric supply feeding the machine 6 A residual current device RCD having a rated residual operating current not exceeding 30mA must be installed 7 The machines with el...

Страница 8: ...hydraulic systems causing damage to the machine and risking personal injury Rocket Espresso recommends installation of an in line filter Water pressure from the mains Maximum water inlet pressure is 6 Bar 0 6 MPa 600 KPa Please install a pressure reducing valve if water pressure from the mains is higher The minimum water pressure is 1 5 Bar 0 15MPa 1500 KPa Hydraulic connections Water inlet 3 8 ga...

Страница 9: ...1 06 in 535 mm 21 06 in D 55 mm 2 17 in 55 mm 2 17 in E 1 025 mm 40 35 in 1 025 mm 40 35 in F 263 mm 10 35 in 373 mm 14 69 in G 50 mm 1 97 in 160 mm 6 30 in H 110 mm 4 33 in 80 mm 3 15 in L 150 mm 5 90 in 150 mm 5 90 in M 290 mm 11 42 in 290 mm 11 42 in N 115 mm 4 53 in 115 mm 4 53 in O 100 mm 3 94 in 100 mm 3 94 in 1 Shut off valve water mains not included to delivery 2 Pressure reducing valve no...

Страница 10: ...e burns 3 Steam handle 4 Cups tray Do never pour any liquid on this tray It will filter inside the equipment and can cause electrical shocks and serious injuries 5 Key pad 6 Hot water wand Caution can become hot and cause burns 7 Pump pressure gauge Pump pressure should be around 9 Bar 8 Boiler pressure gauge Boiler pressure should be around 0 9 Bar 9 Drip tray 10 Filter handle Caution can become ...

Страница 11: ...never pour any liquid on this tray It will filter inside the equipment and can cause electrical shocks and serious injuries 5 Coffee dispensing start stop button 6 Hot water wand Caution can become hot and cause burns 7 Pump pressure gauge Pump pressure should be around 9 Bar 8 Boiler pressure gauge Boiler pressure should be around 0 9 Bar 9 Drip tray 10 Filter handle Caution can become hot and ca...

Страница 12: ...ed to delivery Turn the on off switch Fig 1 or Fig 1B Pos 1 from position 0 to position 1 Wait till the boiler pressure has reached the working pressure 0 9 bar approx You can check it on the gauge Fig 1 or Fig 1B Pos 8 Open the steam handle Fig 1 or Fig 1B Pos 3 for some seconds and then close it This operation avoids milk resuction into the boiler Wait till the working pressure has been reached ...

Страница 13: ...uantity of coffee i e 25 cc 1 oz for a typical espresso has been dispensed the machine will stop automatically automatic portion control 9 Remove the filter handle Fig 1 10 from the machine and empty used coffee grounds Preparing TWO cups of espresso 1 Use two cup filter handle with 2 spouts 2 Position the metal two cup filter basket firmly inside the filter handle 3 Pour two portions app 12 14 g ...

Страница 14: ...sso Press this key to begin espresso dispensing and press again to stop the supply For all other procedure please see above Dispensing of hot water 1 Position the end nozzle of the hot water wand Fig 1 6 inside a suitable pitcher used for food only 2 Press the hot water key Fig 2 F 3 Hot water will be dispensed into the pitcher 4 When the programmed quantity of hot water has been reached the dispe...

Страница 15: ...the requested quantity of coffee i e 25 cc 1 oz for a typical espresso has been dispensed push the coffee dispensing key again to stop dispensing 9 Remove the filter handle Fig 1B 10 from the machine and empty used coffee grounds Preparing TWO cups of espresso 1 Use two cup filter handle with 2 spouts 2 Position the metal two cup filter basket firmly inside the filter handle 3 Pour two portions ap...

Страница 16: ...fications subject to change without notice Page 16 Dispensing of hot water 1 Position the end nozzle of the hot water wand Fig 1B 6 inside a suitable pitcher used for food only 2 Open the hot water valve Fig 1B 12 3 Hot water will be dispensed into the pitcher 4 When the requested quantity of hot water has been dispensed close the hot water valve again ...

Страница 17: ...lk has previously been steamed and stored in the refrigerator we suggest adding some fresh milk in order to achieve optimum foam Milk should be stored at a temperature around 4 5 C app 40 F 2 Insert steam wand s Fig 1 or 1B 2 nozzle into the centre milk just below the surface of the milk 3 Open steam valve Fig 1 or 1B 3 rapidly 4 Steam will come out of the nozzle and froth the milk The milk volume...

Страница 18: ...hots as well as preventing breakdowns or even worse personal injuries After each use Wipe the steam wand Fig 1 or Fig 1B Pos 2 immediately after using with a non abrasive clean damp towel without touching it directly with any part of the body to avoid injury or damage due to the hot surface of steam wand end nozzle Do not let the milk bake onto the steam wand Clogged wands and steam valves can be ...

Страница 19: ...achines automatic portion control please use the built in semiautomatic back flushing program Select the group you wish to back flush Now operating with the selected group keep key Fig 2 A depressed while depressing key Fig 2 B The leds of both keys start flashing When the back flushing cycle is finished these keys stop flashing Remove the filter holder from the group and depress key Fig 2 A again...

Страница 20: ...nes Clean the drip tray Fig 1 or Fig 1B Pos 9 and grid with a non abrasive damp cloth Clean drain tray located under the drip tray with a clean damp cloth and a clean brush Wipe down surface of machine with non abrasive clean cloth Do never use aggressive cleaners or scouring powders This operation has to be done when necessary How to disassemble dismantle the machine The machine has to be disasse...

Страница 21: ...rewing heads Therefore there is no need to do the coffee portion settings again on the other groups Note you can always set the other groups separately following below instruction for left side group Note We strongly suggest setting the coffee portions under working conditions This means using for the product key you wish to set it s corresponding filter holder with the right amount of properly gr...

Страница 22: ...eep key A P pressed until it s led is flashing Release key A and press the F key of this group Hot water dispensing will start When the desired quantity of water has been dispensed depress key F again Dispensing will stop the portion for this product key is set Key A will flash 2 Now you have three options to leave the portion programming mode a Depress key A three times The leds of all keys will ...

Страница 23: ... read OFF Now depress key A again until the display reads the first programming step language Now you are in the programming mode Please remember the following Key B and C are to change a setting Key A is to confirm and to move to the next setting The first parameter displayed when in programming mode is LANGUAGE Use key B or C to change language and press key A to confirm Now the display reads NA...

Страница 24: ...Factory set Do not set anything and depress A to go ahead FillingUp Coffee Disabled ex factory No boiler water filling during coffee dispensing Doses setting Enabled ex factory Portions can be set without need of entering the technician s menu Continuous key Enabled ex factor To allow operating the P key of machine for semi automatic coffee dispensing Tea pump Do not set anything and depress A to ...

Страница 25: ...isplay reads Probe sensitivity The factory setting is medium This setting is related to the conductivity of the water Setting the right sensitivity allows the correct function of the machine s automatic boiler level control system The sensitivity of the probe can be set to Low 150 Ω Medium 400 Ω High 1 M Ω The next settings are Service cycles This setting is 0000 disabled ex factory Boiler probe M...

Страница 26: ...til the display reads language You are again in technician programming mode Please proceed scrolling the menu using A key to the setting you wish to correct When done depress key A repetitiously until the display reads OFF Depress key D to move to machine s normal operation In case of a major setting mistake all led on the keys are flashing Please scroll the menu with A key until the display reads...

Страница 27: ...anch Via Curiel 13 20060 Liscate Milano Italy IT05846260965 This is to confirm that the Rocket Espresso R8V R8 RE A RE S Boxer series of espresso machines had been manufactured according to the following standards 2004 108 EC EMC EN 55014 1 2006 A1 2009 A2 2011 EN 55014 2 1997 AC 1997 A1 2001 A2 2008 EN 61000 3 2 2006 A1 2009 A1 2009 EN 61000 3 3 2013 2006 95 EC LOW TENSION EN 60335 1 2012 EN 6033...

Страница 28: ...___________________________________________________________ Rocket Espresso Ltd RE series User Manual Ed 07 2015 Specifications subject to change without notice Page 28 RE A espresso machines Electrical diagram of 2 nd 3 group machines ...

Страница 29: ...ement 5 Solenoid valve anti vacuum system 6 Thermostat anti vacuum system 7 Thermo cut off switch 8 Static SSR relay 9 Pump motor 10 Solenoid valve group 1 11 Solenoid valve group 2 12 Solenoid valve group 3 13 Solenoid valve boiler filling 14 Solenoid valve hot water 15 Solenoid valve hot water tempering 16 Control board 17 Flow meter group 1 18 Flowmeter group 2 19 Flowmeter group 3 20 Pressure ...

Страница 30: ...________________________________________________________________________ Rocket Espresso Ltd RE series User Manual Ed 07 2015 Specifications subject to change without notice Page 30 RE A espresso machines Hydraulic circuit ...

Страница 31: ... to water mains 2 Water inlet filter 3 Pump 4 Valve block 5 Manual boiler fill valve 6 Non return valve 7 Expansion valve 8 Boiler fill solenoid valve 9 Boiler level sight glass 10 Flow meter 11 Steam valve 12 Hot water pipe 13 Hot water solenoid valve 14 Solenoid valve DAVS 15 Safety valve 16 Anti vacuum valve 17 Heat exchanger injection pipe 18 Group solenoid valve 19 Solenoid valve hot water te...

Отзывы: