pag. 9
ENGLISH
INDEX
1. SPECIFICATIONS
1.1 Technical specifications
1.2 Breakdown of delivered components
1.3 Diagram of the appliance measurements
2. REQUIREMENTS PRIOR TO INSTALLATION
2.1 Floor
2.2 Wall
2.3 Flue liner
2.4 Type of appliance
2.5 Security insulation and distance
2.6 Air supply
2.7 Changes in the device
3. INSTALLATION
3.1 Installation process
4. USE AND OPERATION
4.1 Fuels authorized by the manufacturer
4.2 Pilot fire lighting
4.3 Combustion control
4.3.1 Primary register
4.3.2 Secondary register
4.4 Fire lighting
4.5 Load and reload
4.6 Door opening
4.7 Operation in adverse weather conditions
4.8 Fire Prevention
5. MAINTENANCE AND CLEANING
5.1 Maintenance
5.1.1 Locking mechanisms
5.1.2 Spare parts
5.2
Cleaning
5.2.1 Glass
5.2.2 Ash box
5.2.3 Flue liner
5.2.4 Painting
6. PROBLEMS: CAUSE AND SOLUTION
7. CE LABELLING
This manual consists of two documents, document I:
USER’S GUIDE ON SPECIFICATIONS, INSTALLATION AND
OPERATION
,
and document II:
ANNEX.
The
ANNEXED
document
contains all the diagrams and pictures referenced
herein.
CAUTION:
IT IS VERY IMPORTANT TO READ AND FOLLOW THESE USERS' MANUAL
INSTRUCTIONS PRIOR TO INSTALLATION AND USE OF THE EQUIPMENT.