
Robus Energy Ltd
3 of 26
MCS 0001RE
Issue 2.1
March 2014
Comments on the manual
Never handle the auger, blower, nor crawl in the hopper when the system is powered.
There will be no warning prior to the activation of these components. The boiler must
not be operated without the shield on the burner.
The system is provided with an electrical current of 230V/50Hz. An improper
installation or improper repair can cause life-threatening electrical shock. Electrical
connections must be performed by the person who has the right skills and training.
Performance of electrical installation must be carried out in COMPLIANCE with the
relevant rules. Always disconnect the system from the electrical supply prior to starting
maintenance work or servicing. The system must be connected to a separate electrical
circuit, which is equipped with the proper circuit breaker and earth leakage breaker.
The boiler must be mounted to a functioning chimney. In the event that you smell
smoke or see any other indication of improper draft of the chimney, all operation of
your system must cease immediately and must remain so until a solution to the draft
problem has been resolved. Continuing operation may result in death or injury.
Always read the manual before system installation or repair. If in doubt, seek
professional help.
Open top covers etc. with extreme caution. When the boiler is in operation, there is a
risk of high temperature surrounding the top covers, which can result in injury. Avoid
handling the boiler while it is in operation. Never open the ash tray while the boiler is
in operation. The system may be operated by skilled people. If you are in doubt as to
the safe operational use of the boiler, contact your dealer.
The menu structure etc. for the controller is supported by the help texts found in the
control box itself. Due to constant updates and new features, the menu structure of
the controller will not be described here in this manual. Instead, it is recommended to
browse the controller thoroughly prior to use and to receive an overview of all
functions, etc. by your installer.
This manual must be kept with the boiler!
Содержание Black Star 10 Comfort
Страница 1: ...Black Star Pellet System...
Страница 5: ...Robus Energy Ltd 5 of 26 MCS 0001RE Issue 2 1 March 2014 Boiler Specifications...
Страница 14: ...Robus Energy Ltd 14 of 26 MCS 0001RE Issue 2 1 March 2014 Electrical Connections...
Страница 23: ...Robus Energy Ltd 23 of 26 MCS 0001RE Issue 2 1 March 2014 Trouble shooting...
Страница 26: ...Robus Energy Ltd 26 of 26 MCS 0001RE Issue 2 1 March 2014 CE declaration of conformity...