Robus Black Star 10 Comfort Скачать руководство пользователя страница 3

 

 

Robus Energy Ltd 

 

3 of 26 

MCS 0001RE 

Issue 2.1 

March 2014 

 

Comments on the manual 

 

Never handle the auger, blower, nor crawl in the hopper when the system is powered. 
There will be no warning prior to the activation of these components. The boiler must 
not be operated without the shield on the burner.  

 

 

The  system  is  provided  with  an  electrical  current  of  230V/50Hz.  An  improper 
installation  or  improper  repair  can  cause  life-threatening  electrical  shock.  Electrical 
connections  must  be  performed  by  the  person  who  has  the  right  skills  and  training. 
Performance  of  electrical  installation  must  be  carried  out  in  COMPLIANCE  with  the 
relevant rules. Always disconnect the system from the electrical supply prior to starting 
maintenance work or servicing. The system must be connected to a separate electrical 
circuit, which is equipped with the proper circuit breaker and earth leakage breaker.  

The  boiler  must  be  mounted  to  a  functioning  chimney.  In  the  event  that  you  smell 
smoke or  see any other indication of improper draft  of the chimney, all operation of 
your system must cease immediately and must remain so until a solution to the draft 
problem has been resolved. Continuing operation may result in death or injury.  

 

 

Always  read  the  manual  before  system  installation  or  repair.  If  in  doubt,  seek 
professional help.  

 

 

 

Open top covers etc. with extreme caution. When the boiler is in operation, there is a 
risk of high temperature surrounding the top covers, which can result in injury. Avoid 
handling the boiler while it is in operation. Never open the ash tray while the boiler is 
in operation. The system may be operated by skilled people. If you are in doubt as to 
the safe operational use of the boiler, contact your dealer.  

 

The menu structure etc. for the controller is supported by the help texts found in the 
control  box  itself.  Due  to  constant  updates  and  new  features,  the  menu  structure  of 
the controller will not be described here in this manual. Instead, it is recommended to 
browse  the  controller  thoroughly  prior  to  use  and  to  receive  an  overview  of  all 
functions, etc. by your installer.  

 

This manual must be kept with the boiler! 

Содержание Black Star 10 Comfort

Страница 1: ...Black Star Pellet System...

Страница 2: ...ntroller and is therefore not described here in this manual It is recommended to study the menus prior to initial start Save this manual so you always have it available when needed Page 3 Comments on...

Страница 3: ...mell smoke or see any other indication of improper draft of the chimney all operation of your system must cease immediately and must remain so until a solution to the draft problem has been resolved C...

Страница 4: ...rs in the devolved administrations for those countries Separate legislation the Clean Air Northern Ireland Order 1981 applies in Northern Ireland Therefore it is a requirement that fuels burnt or obta...

Страница 5: ...Robus Energy Ltd 5 of 26 MCS 0001RE Issue 2 1 March 2014 Boiler Specifications...

Страница 6: ...aft stabilizer Installation of the burner Installing the burner on the boiler 1 Check that the burner is not damaged during transport 2 Check that the burning grate is inserted correctly in the burner...

Страница 7: ...y thermostat Mount on either the left or right side of the boiler as displayed in image Note Functional testing of the high limit safety thermostat is required before starting up the boiler To test pr...

Страница 8: ...with 230V AC through the socket located on the back of the boiler In the control box make a connection to output L5 L10 The cleaning system will run every time the burner conducts a blower cleaning s...

Страница 9: ...d system up to max 2 5 bar Standard load valve installation Failure to correctly install the load valve will void any future warranty The load valve supplied with the boiler must be installed in the b...

Страница 10: ...the outdoor temperature The mixing valve mixes high temperature water from the 3 port valve with cooler return water from the heating system The 3 way valve is controlled by the Version 10 controller...

Страница 11: ...ing via the vacuum transport Steel Hopper Available in 4 different models 60x60cm 200L 140 kg 80x80cm 320L 220kg 80x140cm ext 500L 350kg 100x100cm 500L 350kg Fabric Hopper Available in three different...

Страница 12: ...amples of ways to configure your vacuum transport Big bag Throw the mole in the bag Easy way to transport 1 ton Flat bottom hopper Is a top fed option that maximizes space by minimizing ceiling height...

Страница 13: ...rch 2014 Wiring Diagram There may be factory installed wiring on the outputs L5 L10 L5 may be factory fitted for the moving grate L6 may be factory fitted for the compressor cleaning Remove these if t...

Страница 14: ...Robus Energy Ltd 14 of 26 MCS 0001RE Issue 2 1 March 2014 Electrical Connections...

Страница 15: ...Robus Energy Ltd 15 of 26 MCS 0001RE Issue 2 1 March 2014 Optional Equipment The controller supports the following equipment to aid in making adjustments cleaning and trouble shooting...

Страница 16: ...ppear on the screen indicating that the controller is online If you do not have the possibility of a direct cable connection these adapters picture on right can be used They can establish a connection...

Страница 17: ...ved you will have your own page and burner dashboard After a short period of time you should see data streaming from the burner If you would like to view your system from your smart phone then downloa...

Страница 18: ...works NBE observes abnormalities on your graphs You will be contacted by E mail where we ask your permission to make changes NBE will assess your graphs and the burner reaction pattern and make adjus...

Страница 19: ...tput up until you have a stable flame at 10 power 6 Once the burner is activated an ignition will be made After approx 20 minutes the burner will reach a nominal output 100 If necessary lock the burne...

Страница 20: ...ey Sweeper may not always be removing the ash from the chimney flue Never dispose of hot ashes in the trash but let it cool in a metal bucket Hot ashes can re ignite Burner head Remove any ash or cind...

Страница 21: ...you when to change parts and perform service Please note that service indicators are only expectations based on experience Components can easily have a longer lifetime than suggested by the service in...

Страница 22: ...Robus Energy Ltd 22 of 26 MCS 0001RE Issue 2 1 March 2014 Trouble shooting We have collected the most typical solutions to small problems...

Страница 23: ...Robus Energy Ltd 23 of 26 MCS 0001RE Issue 2 1 March 2014 Trouble shooting...

Страница 24: ...oiler temperature 70C degrees 10 degrees up in the boiler temperature gives 10 degrees more smoke temperature 6 Suitable return temperature 55C degrees Internal surface temperatures below 47 C will ca...

Страница 25: ...s are only made by agreement with Robus Energy To the extent that Robus Energy is liable to the purchaser Robus Energy s liability is limited only to direct loss and not to damages incurred by connect...

Страница 26: ...Robus Energy Ltd 26 of 26 MCS 0001RE Issue 2 1 March 2014 CE declaration of conformity...

Отзывы: