Robus Black Star 10 Comfort Скачать руководство пользователя страница 20

 

 

Robus Energy Ltd 

 

20 of 26 

MCS 0001RE 

Issue 2.1 

March 2014 

 

Cleaning of the burner / boiler. 

Cleaning should be carried out regularly and as needed. There is a big difference in the frequency of 

maintenance required from system to system. The setup, adjustment, and wood pellet quality play 

an important role on how frequent maintenance should be performed.  

The table is only a suggestion and applies only to the BS1016, BS2030 and BS4050 boilers! 

 

 

 

 

 

 

 

Always use personal protective equipment. Dust, ash and soot are hazardous to health! 

Turn off the controller and allow the boiler to cool for approx. 5 min. Once the burner is completely 
turned off, it is ready for cleaning. Unplug the burner, remove the shield, drop shaft, and detach the 
burner from the boiler so work can be easily performed.  

Boiler. 

 

All surfaces inside the boiler must be brushed clean from any deposits and the ash can must be 
emptied. When empting the ash can, pay special attention to any build-up of ash in the rear smoke 
chamber and flue, since the Chimney Sweeper may not always be removing the ash from the 
chimney flue.  

Never dispose of hot ashes in the trash, but let it cool in a metal bucket. Hot ashes can re-ignite.  

Burner head. 

 

Remove any ash or cinders from the grate. Remove any pellet remnants under the burner grate. 
Wipe the photo sensor clean. When re-inserting the photo sensor, ensure that the sensor points 
towards the combustion grate. Ensure that there is nothing lodged in the fan and that it can rotate 
freely.  

Hopper. 

 

Since pellets naturally contain dust, you should periodically empty the hopper completely. The more 
dust there is present in the hopper the less the auger will dispense, and the more unstable the 
dosing. The boiler will go out of adjustment with greater risk of downtime. How often one should 
empty the hopper depends greatly on the quality of the pellets you use.  
Put 1litre of cooking oil or similar into the hopper each time it is emptied (poured over the last 
pellets) and the hopper will automatically empty the sawdust.  

Start-up after cleaning. 

 

Once the pellet boiler is reassembled, turn on the controller and the burner will start itself up.  

Remember to reattach the shield so that the temperature reading on the burner is correct. 

 

Содержание Black Star 10 Comfort

Страница 1: ...Black Star Pellet System...

Страница 2: ...ntroller and is therefore not described here in this manual It is recommended to study the menus prior to initial start Save this manual so you always have it available when needed Page 3 Comments on...

Страница 3: ...mell smoke or see any other indication of improper draft of the chimney all operation of your system must cease immediately and must remain so until a solution to the draft problem has been resolved C...

Страница 4: ...rs in the devolved administrations for those countries Separate legislation the Clean Air Northern Ireland Order 1981 applies in Northern Ireland Therefore it is a requirement that fuels burnt or obta...

Страница 5: ...Robus Energy Ltd 5 of 26 MCS 0001RE Issue 2 1 March 2014 Boiler Specifications...

Страница 6: ...aft stabilizer Installation of the burner Installing the burner on the boiler 1 Check that the burner is not damaged during transport 2 Check that the burning grate is inserted correctly in the burner...

Страница 7: ...y thermostat Mount on either the left or right side of the boiler as displayed in image Note Functional testing of the high limit safety thermostat is required before starting up the boiler To test pr...

Страница 8: ...with 230V AC through the socket located on the back of the boiler In the control box make a connection to output L5 L10 The cleaning system will run every time the burner conducts a blower cleaning s...

Страница 9: ...d system up to max 2 5 bar Standard load valve installation Failure to correctly install the load valve will void any future warranty The load valve supplied with the boiler must be installed in the b...

Страница 10: ...the outdoor temperature The mixing valve mixes high temperature water from the 3 port valve with cooler return water from the heating system The 3 way valve is controlled by the Version 10 controller...

Страница 11: ...ing via the vacuum transport Steel Hopper Available in 4 different models 60x60cm 200L 140 kg 80x80cm 320L 220kg 80x140cm ext 500L 350kg 100x100cm 500L 350kg Fabric Hopper Available in three different...

Страница 12: ...amples of ways to configure your vacuum transport Big bag Throw the mole in the bag Easy way to transport 1 ton Flat bottom hopper Is a top fed option that maximizes space by minimizing ceiling height...

Страница 13: ...rch 2014 Wiring Diagram There may be factory installed wiring on the outputs L5 L10 L5 may be factory fitted for the moving grate L6 may be factory fitted for the compressor cleaning Remove these if t...

Страница 14: ...Robus Energy Ltd 14 of 26 MCS 0001RE Issue 2 1 March 2014 Electrical Connections...

Страница 15: ...Robus Energy Ltd 15 of 26 MCS 0001RE Issue 2 1 March 2014 Optional Equipment The controller supports the following equipment to aid in making adjustments cleaning and trouble shooting...

Страница 16: ...ppear on the screen indicating that the controller is online If you do not have the possibility of a direct cable connection these adapters picture on right can be used They can establish a connection...

Страница 17: ...ved you will have your own page and burner dashboard After a short period of time you should see data streaming from the burner If you would like to view your system from your smart phone then downloa...

Страница 18: ...works NBE observes abnormalities on your graphs You will be contacted by E mail where we ask your permission to make changes NBE will assess your graphs and the burner reaction pattern and make adjus...

Страница 19: ...tput up until you have a stable flame at 10 power 6 Once the burner is activated an ignition will be made After approx 20 minutes the burner will reach a nominal output 100 If necessary lock the burne...

Страница 20: ...ey Sweeper may not always be removing the ash from the chimney flue Never dispose of hot ashes in the trash but let it cool in a metal bucket Hot ashes can re ignite Burner head Remove any ash or cind...

Страница 21: ...you when to change parts and perform service Please note that service indicators are only expectations based on experience Components can easily have a longer lifetime than suggested by the service in...

Страница 22: ...Robus Energy Ltd 22 of 26 MCS 0001RE Issue 2 1 March 2014 Trouble shooting We have collected the most typical solutions to small problems...

Страница 23: ...Robus Energy Ltd 23 of 26 MCS 0001RE Issue 2 1 March 2014 Trouble shooting...

Страница 24: ...oiler temperature 70C degrees 10 degrees up in the boiler temperature gives 10 degrees more smoke temperature 6 Suitable return temperature 55C degrees Internal surface temperatures below 47 C will ca...

Страница 25: ...s are only made by agreement with Robus Energy To the extent that Robus Energy is liable to the purchaser Robus Energy s liability is limited only to direct loss and not to damages incurred by connect...

Страница 26: ...Robus Energy Ltd 26 of 26 MCS 0001RE Issue 2 1 March 2014 CE declaration of conformity...

Отзывы: