First time start up. 

Once the system is assembled, filled with water, and power is connected to the system a few basic 

adjustments to the burner is required.  

1. Fill the auger with pellets by force starting the auger either through the controller or directly via a 

230V connection.  

2. When the augur appears full, run for an additional 15 min. to 

ensure correct weighing later.  

3. Activate the 6 min. test run in the controller and collect the 

dispensed pellets with a plastic bag.  

4. Using a kitchen scale, weigh the pellets from the test run and enter the amount into the controller 

under 

"Auto calculation" Repeat again after 7 days! 

 

5. Adjust minimum output as low as possible, typically 10% of the burner's rated output (i.e. if 20kW, 

set to 2.00kW). If the chimney draft is high, adjust the minimum output up until you have a stable 

flame at 10% power.  

6. Once the burner is activated an ignition will be made. After approx. 20 minutes the burner will 

reach a nominal output (100%). If necessary lock the burner output at 100%. Now you can perform 

an evaluation as to whether the fan is providing suitable supply of air to the flame. If necessary, 

adjust in the fan menu.  

The flame at 100% should fill the entire width of the grate, have 

redish spikes, and reach the opposite wall.  

7. Lock the burner to 50% power. Wait 5 minutes for the flame to 

stabilize. Again, assess fan performance in relation to the flame.  

The flame at 50% should be approx. 10 cm out of the burner and is 

yellowish in colour.

  

8. Lock the burner to 10% power. Wait 5 minutes for the flame to 

stabilize. Assess fan performance in relationship to the flame.  

The flame at 10% should be small and short.  

The photo sensor reading may fluctuate, however, it should not have a 

0 LUX reading for a period >10 sec. If the chimney draft is too high, 

increase the minimum effect of the burner to increase flame size.  

 

Содержание Black Star 10 Comfort

Страница 1: ...Black Star Pellet System...

Страница 2: ...ntroller and is therefore not described here in this manual It is recommended to study the menus prior to initial start Save this manual so you always have it available when needed Page 3 Comments on...

Страница 3: ...mell smoke or see any other indication of improper draft of the chimney all operation of your system must cease immediately and must remain so until a solution to the draft problem has been resolved C...

Страница 4: ...rs in the devolved administrations for those countries Separate legislation the Clean Air Northern Ireland Order 1981 applies in Northern Ireland Therefore it is a requirement that fuels burnt or obta...

Страница 5: ...Robus Energy Ltd 5 of 26 MCS 0001RE Issue 2 1 March 2014 Boiler Specifications...

Страница 6: ...aft stabilizer Installation of the burner Installing the burner on the boiler 1 Check that the burner is not damaged during transport 2 Check that the burning grate is inserted correctly in the burner...

Страница 7: ...y thermostat Mount on either the left or right side of the boiler as displayed in image Note Functional testing of the high limit safety thermostat is required before starting up the boiler To test pr...

Страница 8: ...with 230V AC through the socket located on the back of the boiler In the control box make a connection to output L5 L10 The cleaning system will run every time the burner conducts a blower cleaning s...

Страница 9: ...d system up to max 2 5 bar Standard load valve installation Failure to correctly install the load valve will void any future warranty The load valve supplied with the boiler must be installed in the b...

Страница 10: ...the outdoor temperature The mixing valve mixes high temperature water from the 3 port valve with cooler return water from the heating system The 3 way valve is controlled by the Version 10 controller...

Страница 11: ...ing via the vacuum transport Steel Hopper Available in 4 different models 60x60cm 200L 140 kg 80x80cm 320L 220kg 80x140cm ext 500L 350kg 100x100cm 500L 350kg Fabric Hopper Available in three different...

Страница 12: ...amples of ways to configure your vacuum transport Big bag Throw the mole in the bag Easy way to transport 1 ton Flat bottom hopper Is a top fed option that maximizes space by minimizing ceiling height...

Страница 13: ...rch 2014 Wiring Diagram There may be factory installed wiring on the outputs L5 L10 L5 may be factory fitted for the moving grate L6 may be factory fitted for the compressor cleaning Remove these if t...

Страница 14: ...Robus Energy Ltd 14 of 26 MCS 0001RE Issue 2 1 March 2014 Electrical Connections...

Страница 15: ...Robus Energy Ltd 15 of 26 MCS 0001RE Issue 2 1 March 2014 Optional Equipment The controller supports the following equipment to aid in making adjustments cleaning and trouble shooting...

Страница 16: ...ppear on the screen indicating that the controller is online If you do not have the possibility of a direct cable connection these adapters picture on right can be used They can establish a connection...

Страница 17: ...ved you will have your own page and burner dashboard After a short period of time you should see data streaming from the burner If you would like to view your system from your smart phone then downloa...

Страница 18: ...works NBE observes abnormalities on your graphs You will be contacted by E mail where we ask your permission to make changes NBE will assess your graphs and the burner reaction pattern and make adjus...

Страница 19: ...tput up until you have a stable flame at 10 power 6 Once the burner is activated an ignition will be made After approx 20 minutes the burner will reach a nominal output 100 If necessary lock the burne...

Страница 20: ...ey Sweeper may not always be removing the ash from the chimney flue Never dispose of hot ashes in the trash but let it cool in a metal bucket Hot ashes can re ignite Burner head Remove any ash or cind...

Страница 21: ...you when to change parts and perform service Please note that service indicators are only expectations based on experience Components can easily have a longer lifetime than suggested by the service in...

Страница 22: ...Robus Energy Ltd 22 of 26 MCS 0001RE Issue 2 1 March 2014 Trouble shooting We have collected the most typical solutions to small problems...

Страница 23: ...Robus Energy Ltd 23 of 26 MCS 0001RE Issue 2 1 March 2014 Trouble shooting...

Страница 24: ...oiler temperature 70C degrees 10 degrees up in the boiler temperature gives 10 degrees more smoke temperature 6 Suitable return temperature 55C degrees Internal surface temperatures below 47 C will ca...

Страница 25: ...s are only made by agreement with Robus Energy To the extent that Robus Energy is liable to the purchaser Robus Energy s liability is limited only to direct loss and not to damages incurred by connect...

Страница 26: ...Robus Energy Ltd 26 of 26 MCS 0001RE Issue 2 1 March 2014 CE declaration of conformity...

Отзывы: