Robus Black Star 10 Comfort Скачать руководство пользователя страница 25

 

 

Robus Energy Ltd 

 

25 of 26 

MCS 0001RE 

Issue 2.1 

March 2014 

 

Warranty 

All  products  purchased  from 

Robus  Energy

  are  covered  by  the  standard  1  year  warranty.  This 

includes  12  months warranty on  the  products  valid from  the  date of  receipt. A  2 year  warranty  is 
granted with the completion of the 

Warranty Registration

.  

Note: Electrical Igniters are not covered under the warranty as they are a wearable part.  

The  warranty  only  covers  manufacturing  and  material  defects.  In  case  of  product  failure  of  the 
system when under warranty, 

Robus Energy

 will replace the spare part at no charge to the buyer. 

Buyer  will  be  responsible  for  the  installation  or  replacement  of  the  part.  If 

Robus  Energy

  offers 

replacement  of  the  defective  part  the  purchaser  shall  send  the  part  to 

Robus  Energy

  for 

replacement.  Guarantee  shall  be  invalid  if  product  failure  is  due  to  circumstances  caused  by  the 
buyer;  either  by  accident  and/or  abuse  of  the  product,  poor  installation,  inadequate  cleaning, 
chimney conditions, as well as circumstances where 

Robus Energy

 has no influence. In addition, the 

warranty is invalid due to misuse of the burner for example using fuel that is not approved by 

Robus 

Energy.

  The warranty does not  cover parts such as the  electrical igniter. The buyer is obligated to 

check the goods immediately upon receipt. If the buyer declares that the delivery was inadequate or 
defective,  the  customer  must  immediately  and  without  delay  make  a  written  claim  with 

Robus 

Energy

. Returns are only made by agreement with 

Robus Energy

. To the extent that

 Robus Energy

 is 

liable  to  the  purchaser, 

Robus  Energy’s

  liability  is  limited  only  to  direct  loss  and  not  to  damages 

incurred  by  connected  equipment  and/or  indirect  damage,  loss  of  earnings,  operating  losses, 
connection costs, etc.  

Responsibilities: 

Robus  Energy

  assumes  no  responsibility  as  a  result  of  the  purchaser's  legal 

relations  with  third  parties.  All  orders  are  accepted  subject  to  force  majeure,  including  war,  civil 
unrest,  natural  disasters,  strikes  and  lockouts,  failing  supplies  of  raw  materials,  fire,  damage  to

 

Robus Energy

 or its supplier network, lack of transport opportunities, import / export prohibitions or 

any other  event which prevents or restricts 

Robus Energy’s

  ability to deliver. 

Robus Energy

  has in 

cases  of  force  majeure,  the  right  to  cancel  the  transaction  or  any  part  thereof,  or  to  deliver  the 
agreed  product  as  soon  as  the  obstacle  to  normal  delivery  has  lapsed.  In  cases  of  force  majeure, 

Robus  Energy

  will  not  be  held  responsible  for  any  losses  incurred  by  the  purchaser  due  to  non-

delivery. 

Robus  Energy

  will  not  be  held  responsible  for  any changes  and/or  faults  related  to  price 

changes,  sold  out  items  or  changes  to  specifications  in  the  product  manual.  It  is  the  buyer's 
responsibility to register the equipment to the appropriate authorities. If any disputes arise between 
the authorities and the purchaser, 

Robus Energy

 will be held harmless from any claims or disputes.  

The following can be delivered upon request:  

•Exception of the expansion by Labour Inspectorate.  

•Chimneys endorsements.  

•Approval of Technology Institute (DTI). 

•Print charts.  

Material is also available on www.nbe.dk  

 

Содержание Black Star 10 Comfort

Страница 1: ...Black Star Pellet System...

Страница 2: ...ntroller and is therefore not described here in this manual It is recommended to study the menus prior to initial start Save this manual so you always have it available when needed Page 3 Comments on...

Страница 3: ...mell smoke or see any other indication of improper draft of the chimney all operation of your system must cease immediately and must remain so until a solution to the draft problem has been resolved C...

Страница 4: ...rs in the devolved administrations for those countries Separate legislation the Clean Air Northern Ireland Order 1981 applies in Northern Ireland Therefore it is a requirement that fuels burnt or obta...

Страница 5: ...Robus Energy Ltd 5 of 26 MCS 0001RE Issue 2 1 March 2014 Boiler Specifications...

Страница 6: ...aft stabilizer Installation of the burner Installing the burner on the boiler 1 Check that the burner is not damaged during transport 2 Check that the burning grate is inserted correctly in the burner...

Страница 7: ...y thermostat Mount on either the left or right side of the boiler as displayed in image Note Functional testing of the high limit safety thermostat is required before starting up the boiler To test pr...

Страница 8: ...with 230V AC through the socket located on the back of the boiler In the control box make a connection to output L5 L10 The cleaning system will run every time the burner conducts a blower cleaning s...

Страница 9: ...d system up to max 2 5 bar Standard load valve installation Failure to correctly install the load valve will void any future warranty The load valve supplied with the boiler must be installed in the b...

Страница 10: ...the outdoor temperature The mixing valve mixes high temperature water from the 3 port valve with cooler return water from the heating system The 3 way valve is controlled by the Version 10 controller...

Страница 11: ...ing via the vacuum transport Steel Hopper Available in 4 different models 60x60cm 200L 140 kg 80x80cm 320L 220kg 80x140cm ext 500L 350kg 100x100cm 500L 350kg Fabric Hopper Available in three different...

Страница 12: ...amples of ways to configure your vacuum transport Big bag Throw the mole in the bag Easy way to transport 1 ton Flat bottom hopper Is a top fed option that maximizes space by minimizing ceiling height...

Страница 13: ...rch 2014 Wiring Diagram There may be factory installed wiring on the outputs L5 L10 L5 may be factory fitted for the moving grate L6 may be factory fitted for the compressor cleaning Remove these if t...

Страница 14: ...Robus Energy Ltd 14 of 26 MCS 0001RE Issue 2 1 March 2014 Electrical Connections...

Страница 15: ...Robus Energy Ltd 15 of 26 MCS 0001RE Issue 2 1 March 2014 Optional Equipment The controller supports the following equipment to aid in making adjustments cleaning and trouble shooting...

Страница 16: ...ppear on the screen indicating that the controller is online If you do not have the possibility of a direct cable connection these adapters picture on right can be used They can establish a connection...

Страница 17: ...ved you will have your own page and burner dashboard After a short period of time you should see data streaming from the burner If you would like to view your system from your smart phone then downloa...

Страница 18: ...works NBE observes abnormalities on your graphs You will be contacted by E mail where we ask your permission to make changes NBE will assess your graphs and the burner reaction pattern and make adjus...

Страница 19: ...tput up until you have a stable flame at 10 power 6 Once the burner is activated an ignition will be made After approx 20 minutes the burner will reach a nominal output 100 If necessary lock the burne...

Страница 20: ...ey Sweeper may not always be removing the ash from the chimney flue Never dispose of hot ashes in the trash but let it cool in a metal bucket Hot ashes can re ignite Burner head Remove any ash or cind...

Страница 21: ...you when to change parts and perform service Please note that service indicators are only expectations based on experience Components can easily have a longer lifetime than suggested by the service in...

Страница 22: ...Robus Energy Ltd 22 of 26 MCS 0001RE Issue 2 1 March 2014 Trouble shooting We have collected the most typical solutions to small problems...

Страница 23: ...Robus Energy Ltd 23 of 26 MCS 0001RE Issue 2 1 March 2014 Trouble shooting...

Страница 24: ...oiler temperature 70C degrees 10 degrees up in the boiler temperature gives 10 degrees more smoke temperature 6 Suitable return temperature 55C degrees Internal surface temperatures below 47 C will ca...

Страница 25: ...s are only made by agreement with Robus Energy To the extent that Robus Energy is liable to the purchaser Robus Energy s liability is limited only to direct loss and not to damages incurred by connect...

Страница 26: ...Robus Energy Ltd 26 of 26 MCS 0001RE Issue 2 1 March 2014 CE declaration of conformity...

Отзывы: