INTRODUCTION
Installation, use and maintenance manual
This Manual is an integral part of the GAHP A appliance
and must be handed to the end user together with the
appliance.
I.1
RECIPIENTS
This Manual is intended for:
▶
End user, for appropriate and safe use of the appliance.
▶
Qualified installer, for correct appliance installation.
▶
Planner, for specific information on the appliance.
I.2
CONTROL DEVICE
In order to be able to work, the GAHP A unit needs a control
device (DDC, CCP/CCI or external requests), which must be con-
nected by the installer.
II
SYMBOLS AND DEFINITIONS
II.1
KEY TO SYMBOLS
DANGER
WARNING
NOTE
PROCEDURE
REFERENCE (to other document)
II.2
TERMS AND DEFINITIONS
GAHP appliance/unit = equivalent terms, both used to des-
ignate the GAHP gas powered absorption heat pump (Gas
Absorption Heat Pump).
TAC = Technical Assistance Centre authorised by Robur.
External request = generic control device (e.g. thermostat, tim-
er or any other system) equipped with a voltage-free NO contact
and used as control to start/stop the GAHP unit.
CCI Controller (Comfort Controller Interface) = optional Robur
control device which lets you manage up to three consistent
modulating GAHP units (GAHP A, GAHP GS/WS) only for heating.
CCP Controller (Comfort Control Panel) = Robur control device
which lets you manage in modulation mode up to 3 consistent
GAHP units (GAHP A, GAHP GS/WS) and all system components
(probes, diverter/mixing valves, circulating pumps), including
any integration boiler.
DDC Control (Direct Digital Controller) = optional Robur con-
trol device to manage one or more Robur appliances in ON/OFF
mode (GAHP heat pumps, GA chillers) or in modulating mode
(AY boilers).
RB100/RB200 Devices (Robur Box) = optional interface devices
complementary to DDC, which may be used to broaden its func-
tions (heating/cooling/DHW production service demands and
control of system components such as third party generators,
adjustment valves, circulators, probes).
Heat generator = equipment (e.g. boiler, heat pump, etc..) pro-
ducing heating and/or DHW.
GUE (Gas Utilization Efficiency) = efficiency index of gas heat
pumps, equal to the ratio between the thermal energy pro-
duced and the energy of the fuel used (relative to LCV, lower
calorific value).
First start-up = appliance commissioning operation which may
only and exclusively be carried out by a TAC.
S61/Mod10/W10 Boards = electronic boards on the GAHP unit,
to control all functions and to provide interface with other devic-
es and with the user.
III
WARNINGS
III.1
GENERAL AND SAFETY WARNINGS
Installer's qualifications
Installation must exclusively be performed by a qualified
firm and by qualified personnel, with specific knowledge
on heating, cooling, electrical systems and gas applianc-
es, in compliance with the laws in force in the Country of
installation.
Declaration of conformity
Upon completing installation, the installing firm shall
issue to the owner/client the appliance's workmanlike
conformity declaration, according to national/local reg-
ulations in force and the manufacturer's instructions/
provisions.
Misuse
The appliance must only be used for the purposes for
which it has been designed. Any other use is deemed
hazardous. Incorrect use may affect operation, duration
and safety of the appliance. Adhere to the manufactur-
er's instructions.
Use of the appliance by children
The appliance can be used by children over 8 years old,
and by people with reduced physical, sensory or men-
tal capabilities, or lack of experience or knowledge,
only if they are under surveillance or after they have re-
ceived instructions regarding safe use of the appliance