Each "T" junction increases the effective length of the tube to which it is mounted by 3
metres. For example, if the junction is fitted to a 2 metre fumes tube, when calculating
the pressure drop you must deem the total length of the tube to be 5 metres. Each 5°
bend increases the effective length of the tube to which it is mounted by 1.2 metres. For
example, if the bend is fitted to a 2 metre air tube, when calculating the pressure drop
you must deem the total length of the tube to be 3.2 metres.
table 3�3
APPRoxIMAte AdMItted MAxIMUM LenGtHs [m] - by tYPe of installation
B23
C13
C33
C53
fumes tube
separate
tubes
coaxial wall-mounted
coaxial roof-mounted
separate
tubes
dia. 80
dia. 80
dia. 125
O-SCR007
dia. 180 O-KTC004 dia. 125
O-SCR008
dia. 150 O-SCR009 dia. 210 O-KTC001 dia. 80
Horizontal
Vertical
-
dia. 80 tubes
dia. 130 tubes
dia. 80 tubes
dia. 100 tubes
dia. 130 tubes
-
fumes
fumes
air/fumes
air/fumes
air/fumes
air/fumes
air/fumes
air/fumes
air/fumes
30
30
25+25
20+20
N/A
25+25
30+30
N/A
1+25
Approximate maximum lengths.
the above maximum admitted lengths are to be considered APPRoxIMAte and apply
to installations in which the tubes (air and fumes) are routed linearly as shown in Figure
3.5
→
17; Figure 3.6
→
19 and Figure 3.7
→
19. If this condition does not apply, you
must calculate the pressure drop (see "EXAMPLE CALCULATION" below): the installation
is permitted only if the total pressure drop is less than the admitted pressure drop
(see 3.1
→
17).
exAMPLe CALCULAtIon
We are to install a B15 with separate tubes, dia. 80, as follows:
7 metres of fumes tube dia. 80;
•
2 90° bends dia. 80 on the fumes tube;
•
6 metres of air tube dia. 80.
•
We can now calculate the pressure drop (see Table 3.4
→
18), bearing in mind that the
total admitted pressure drop is 60 Pa.
table 3�4
CoMPonent
Quantity [m]
Pressure drop [Pa/m] Pressure drops [Pa]
Dia. 80 fumes tube
7
x
0,7
=
4,9
90° bends
2
x
1,0
=
2,0
Dia. 80 air tubes
6
x
0,4
=
2,4
totAL PRessURe dRoP
=
9,3
Example numerical calculation.
the total pressure drop is less than the admitted pressure drop (9�3 Pa less than
the maximum admitted figure of 60 Pa) and hence the installation is PeRMItted�
If the installation had turned out to be not permitted due to excessive pressure drop, we
could have adopted one of the following measures:
reduce the length of the air/fumes tubes;
•
increase the diameter of the tubes to dia. 100.
•
For special installations, phone ROBUR Presales at +39.035.888.111.
Содержание B15 Generators Series
Страница 4: ...4...
Страница 6: ...6...
Страница 12: ...12...
Страница 24: ...24 3 6 WIRING DIAGRAMS Figure 3 11 Installation diagram LEGEND vedi disegno...
Страница 28: ...28...
Страница 33: ...Installation user and maintenance manual Series B15 Generators 33...