Transport and positioning
16
2
1.6.3.2
AY 50 and AY 100
Figure 1.18
Pressure drop AY 50 and AY 100
A Boiler pressure drop with 35% glycol water
B
Boiler pressure drop with no glycol in water
0
0,1
0,2
0,3
0,4
0,5
0,6
0,7
0,8
0,9
1
1,1
1,2
1,3
500
1000
1500
2000
2500
3000
3500
[bar]
[l/h]
A
B
For AY 100 the curve is the same, as the boiler consists of
two thermal modules in parallel, each with its own water
pump.
2
TRANSPORT AND POSITIONING
2.1
WARNINGS
Damage from transport or installation
The manufacturer shall not be liable for any dam-
age during appliance transport and installation.
On-site inspection
Upon arrival at the site, ensure there is no transport
damage on packing or boiler panels.
After removing the packing materials, ensure the
appliance is intact and complete.
Packing
Only remove the packing after placing the appli-
ance on site.
Do not leave parts of the packing within the reach
of children (plastic, polystyrene, nails...) since they
are potentially dangerous.
Weight
The lifting equipment must be suitable for the load.
Do not stand under suspended loads.
2.2
INSTALLATION KIT
2.2.1
AY 35
The installation kit supplied with the boiler includes:
1. AY 35 condensing boiler.
1. flanged socket Ø 60/80 mm.
1. gasket of the flanged socket.
8. fixing screws of the flanged socket.
1. rain cover.
1. flue gas exhaust kit.
2.2.2
AY 50
The installation kit supplied with the boiler includes:
1. AY 50 condensing boiler.
1. triangle key for opening the front panel.
1. flanged socket Ø 60/80 mm.
1. gasket of the flanged socket.
8. fixing screws of the flanged socket.
1. rain cover.
1. flue gas exhaust kit.
2.
2.2.3
AY 100
The installation kit supplied with the boiler includes:
1. AY 100 condensing boiler.
1. triangle key for opening the front panel.
2. flanged socket Ø 60/80 mm.