- 42 -
(4) Wind the spiral spring.
-1: Hold the case tightly and rotate the reel
counterclockwise until it stops. (It stops
when it is wound approx. 6 turns.)
-2: Turn back the reel slowly by approx. 3/4
turns and hold the reel at the position where
the rope hole of the reel and the rope guide
of the case are aligned.
WARNING
The spring power is at its maximum when the
reel is being wound. Do not put off your hand
nor loosen the pressure of your finger unin-
tentionally.
(5) Setting the rope. (2 people required)
-1: Pass the rope end through the rope guide
to the rope hole on the reel and make a
knot as shown in Fig.10-15.
-2: Put the rope-end-knot in the reel paying
attention that it will not touch the case.
(Fig.10-16)
-3: Hold the rope firmly with the hand at the
position about 50cm from the rope guide
and keep the rope slightly pull so that the
rope will not be wound in.
-4: Release the hand of the reel gently and wind
the rope slowly by the winding power of the
spring until the knob reaches the rope
guide.
Assembly is completed.
*The disassembly and the reassembly have been
completed, however carry out the following to
check if the necessary components have surely
been assembled.
Fig. 10-15
Fig. 10-16
Rope-end
ABOUT
20 mm
Содержание EY15-3
Страница 1: ...SERVICE MANUAL EY15 3 EY20 3 ENGINES Models PUB ES1609 Rev 12 01 ...
Страница 62: ...PRINTED IN THE USA ...