CRV-S
ERIES
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
42 of 85
9.2 General Ventin
g
Re
q
uirements Model EP-100,
EP-200 and EP-300 Series Pumps
This heater m
u
st be
v
ented in accordance
w
ith the
r
u
les contained in this man
u
al and
w
ith the follo
w
ing
national codes and any state, pro
v
incial or local
codes
w
hich may apply:
United States:
Refer to National F
u
el Gas Code
NFPA 54/ANSI Z223.1 - latest re
v
ision.
Canada:
Refer to Nat
u
ral Gas and Propane
Installation Code CSA B149.1 - latest re
v
ision.
Any portion of
v
ent pipe passing thro
u
gh a
comb
u
stible
w
all m
u
st ha
v
e an appro
v
ed thimble
to conform
w
ith the abo
v
e listed codes.
Vent pipe m
u
st be sloped do
w
n
w
ard a
w
ay from the
p
u
mp ¼'' e
v
ery 10' (3 m).
The bottom of the
v
ent or air intake terminal shall not
be located less than 1
'
(0.3 m) abo
v
e grade le
v
el.
The
v
ent shall not terminate less than 7
'
(2.1 m)
abo
v
e grade
w
here located adjacent to p
u
blic
w
alk
w
ays.
Vent terminal m
u
st be installed at a height s
u
fficient
to pre
v
ent blockage by sno
w
, and b
u
ilding materials
protected from degradation by fl
u
e gases.
Sec
u
re all joints
w
ith #8 x 3/8 sheet metal scre
w
s.
Seal all joints
w
ith high temperat
u
re silicone sealant.
Vent terminal m
u
st be beyond any comb
u
stible
o
v
erhang.
9.2.1 United States Re
q
uirements
Vent m
u
st terminate at least 3
'
(0.9 m) abo
v
e any
forced air inlet located
w
ithin 10
'
(3.1 m).
Vent m
u
st terminate at least 4
'
(1.2 m) belo
w
,
4
'
(1.2 m) horizontally from, or 1
'
(0.3 m) abo
v
e any
door, operable
w
indo
w
, or gra
v
ity air inlet into any
b
u
ilding.
9.2.2 Canadian Re
q
uirements
The
v
ent shall not terminate
w
ithin 6
'
(1.8 m) of a
mechanical air s
u
pply inlet to any b
u
ilding.
The
v
ent shall not terminate
w
ithin 3
'
(0.9 m) of a
w
indo
w
or door that can be opened in any b
u
ilding,
any non-mechanical air s
u
pply inlet to any b
u
ilding,
or of the comb
u
stion air inlet of any other appliance.
9.2.3 Vertical Ventin
g
for recommended
v
ertical
v
enting options.
9.2.4 Horizontal Ventin
g
for recommended horizontal
v
enting options.
9.2.5 Len
g
th Re
q
uirements
See EP-100, EP-200 or EP-300 P
u
mp Series
Installation, Operation and Ser
v
ice Man
u
als for
complete
v
enting options.
Vent lengths are allo
w
ed as follo
w
s:
Seal all pipe joints
w
ith high temperat
u
re silicone
sealant in the
v
ent pipe. Ins
u
lation and additional
sealing meas
u
res
w
ill be req
u
ired.
Optional heat exchanger lengths are considered as
v
ent length for length determination.
S
u
btract 15' (4.6 m) of maxim
u
m allo
w
ed
v
ent or
o
u
tside air d
u
ct length per
v
ent elbo
w
if more than
three are
u
sed.
9.2.6 Vent Material Recoendations
Vent recommendations:
1. Porcelain coated t
u
bing 4'' (10 cm) O.D.
(P/N 9141030D)
2. Heat treated al
u
minized t
u
bing 4'' (10 cm) O.D.
(P/N 91409408)
Heat treated al
u
minized t
u
bing 6'' (15 cm) O.D.
(P/N E0009105)
3. Single
w
all fl
u
e pipe - minim
u
m 26 ga.
(Not s
u
itable for mod
u
lating and condensing
system designs.)
4. Sched
u
le 40 ASTM A53 (Latest Edition) grad B
ERW black steel pipe.
NOTE:
4" (10 cm) O.D. Porcelain coated t
u
bing (P/N
9141030D), 4" (10 cm) O.D. Heat treated al
u
minized
t
u
bing (P/N 91409408), and 6" (15 cm) O.D. Heat
treated al
u
minized t
u
bing (P/N E0009105) are
eq
u
i
v
alent to single
w
all fl
u
e pipe.
Vent Len
g
th
EP-300 Vent
Size
EP-200 Vent
Size
EP-100 Vent
Size
Up to 10' (3 m)
6" (15 cm) -
1 elbo
w
4" (10 cm) -
1 elbo
w
4" (10 cm) -
3 elbo
w
s
Up to 25' (8 m)
7" (18 cm) -
3 elbo
w
5" (12.7 cm) -
3 elbo
w
s
4" (10 cm) -
3 elbo
w
s
Up to 50' (15 m)
8" (20 cm) -
3 elbo
w
6" (15 cm) -
3 elbo
w
s
5" (12.7 cm) -
3 elbo
w
s
Содержание Corayvac CRV-B Series
Страница 2: ......
Страница 4: ......
Страница 5: ......
Страница 6: ......
Страница 8: ......
Страница 73: ...SECTION 13 STARTING THE SYSTEM 65 of 85 FIGURE 48 Vacuum Reading ...
Страница 84: ...CRV SERIES INSTALLATION OPERATION AND SERVICE MANUAL 76 of 85 18 1 Troubleshooting Flow Chart ...
Страница 85: ...SECTION18 TROUBLESHOOTING 77 of 85 Troubleshooting Flow Chart ...
Страница 92: ...CRV SERIES INSTALLATION OPERATION AND SERVICE MANUAL 84 of 85 ...
Страница 93: ...SECTION 21 THE ROBERTS GORDON CORAYVAC LIMITED WARRANTY 85 of 85 2017 ...
Страница 94: ......
Страница 95: ......
Страница 96: ......