HED-S
ERIES
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
14
Table 4: Component Packa
g
e Guide
Table 5: Component Packa
g
e Guide
Additional t
u
bing length may be added to heater. T
u
bing m
u
st be heat-treated, al
u
minized or porcelain
coated. Any additional t
u
bing lengths are considered as
v
ent length for length determination. Maxim
u
m
v
enting length for minim
u
m heater length is 45' (13.7 m) total.
Model
Tubin
g
Len
g
th
Standard Core Packa
g
es
Minimum
Hot Rolled Steel
Aluminized
HED-40
10’ (3m)
CPST10ALUM
CPST10ALUMSS
HED-60
20’ (6m)
CPST20ALUM
CPST20ALUMSS
HED-80
20’ (6m)
CPST20ALUM
CPST20ALUMSS
HED-100
30’ (9m)
CPST30ALUM
CPST30ALUMSS
HED-125
40’ (12m)
CPST40ALUM
CPST40ALUMSS
HED-150
50’ (15m)
CPST EXP20ALUM
CPST30 EXP20ALUMSS
HED-175
60’ (18m)
CPST EXP30ALUM
CPST30 EXP30ALUMSS
Model
Tubin
g
Len
g
th
Core and Extension Packa
g
es-SS
Stainless Steel-Hi
g
h Efficiency
HE-40
10' (3 m)
CPST10ALUMEF
HE-60
20' (6 m)
CPST20ALUMEF
HE-80
20' (6 m)
CPST20ALUMEF
HE-100
30' (9 m)
CPST30ALUMEF
HE-125
40' (12 m)
CPST30ALUMEF
HE-150
50' (15 m)
CPST30 EXP20ALUMEF
HE-175
60' (18 m)
CPST30 EXP30ALUMEF
Содержание COMPLETE HED Series
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 24: ...HED SERIES INSTALLATION OPERATION AND SERVICE MANUAL 18 FIGURE 17 Linear Heater Assembly Overview ...
Страница 25: ...SECTION 6 HEATER INSTALLATION 19 FIGURE 18 Linear Heater Layout Overview ...
Страница 35: ...SECTION 7 OPTIONAL HEATER ACCESSORIES 29 FIGURE 21 U Tube Heater Layout Overview ...
Страница 62: ...HED SERIES INSTALLATION OPERATION AND SERVICE MANUAL 56 ...
Страница 63: ...SECTION12 TROUBLESHOOTING 57 12 2 Manifold Gas Pressure Setting ...
Страница 68: ......
Страница 69: ...2017 ...
Страница 70: ......
Страница 71: ......
Страница 72: ......