ROBBE Air Beaver Скачать руководство пользователя страница 3

ENGLISH

3

FLOATS SET

INSTRUCTIONS AND USER MANUAL

thercocking effect).

Open the throttle and allow the aeroplane to accele-

rate  until  it  rises  onto  the  step  of  the  floats,  and  starts 

planing. 

Leave the elevator at the "neutral" position initially. Do 

not apply up-elevator until you actually wish to lift off.

The  increased  drag  caused  by  the  floats  causes  the 

Beaver to respond a little more slowly in the air, and it 

will require a slightly higher throttle setting. Take this into 

account when flying the model, and preparing for the 

landing.

Allow the model to descend steadily by keeping power 

on to a higher level than normal, and allow the aero-

plane to touch down smoothly on the water.

Bring the flight to a close in good time, so that you have 

enough residual current to taxi back to the bank.

At the end of the water flying session open the fuselage 

and check for any water inside. Allow the model to dry 

out if necessary. 

From time to time check that the floats and rudder sys

-

tem have not been damaged by flotsam in the water.

Contents  

Page

Technical specification / general information 

Preparations 3

Building Instructions 

5, 6, 7, 8

Specification

Float length: 

approx. 690 mm

Overall width: 

approx. 435 mm

The robbe floats set

 is designed for the Air Beaver model 

aircraft, but is also suitable for converting other models 

of similar size and weight for flying from water. 

Once the Beaver's standard wheeled undercarriage 

has been removed, the floats assembly can be atta-

ched directly to the fuselage; no other modifications 

are required.

It is also possible at any time to remove the floats 

assembly and convert the model back to wheels again.

Sequence of assembly

Please study the illustrations and the brief instructions to 

obtain a clear understanding of the individual stages of 

construction.

No glued joints are required. All the component parts 

are screwed together.

Function test

The converted model's Centre of Gravity should be 

checked before the first flight.

Check all the control surfaces and the power system, 

and ensure that the water rudders work correctly.

The model should be test-flown and trimmed properly 

before it is fitted with floats and flown from water.

Notes on flying the model; the first take-off from water

Observe all the safety notes, but please ensure in par-

ticular that you do not endanger any other users of the 

water (bathers, boat operators, etc.).

For the first few test-flights using the floats, seek out an 

area of calm water of adequate size, and wait for a day 

with little or no wind. The model is easy to manoeuvre 

on the water thanks to the supplementary rudders atta-

ched to the floats.

Place the model in the water and open the throttle gra-

dually to taxi away from the bank. Switch off the motor, 

and the model will automatically swing into wind (wea-

Carefully undo the undercarriage fairings and remove 

them.

Undo the screws retaining the wing struts, and remove 

the struts.

Undo the undercarriage retaining screws, and remove 

the complete undercarriage.

Preparations

Содержание Air Beaver

Страница 1: ...www robbe com V1_06 2019 BAU UND BETRIEBSANLEITUNG INSTRUCTIONS AND USER MANUAL MANUEL D UTILISATION Schwimmer Set Air Beaver Nr 25691000...

Страница 2: ...aver eignet sich aber auch f r Modelle hnlicher Gr e und mit hnlichem Gewicht zum Umr sten auf Wasserflug Die Schwimmer Einheit kann nach Abnehmen des Beaver Radfahrwerks direkt am Rumpf montiert wer...

Страница 3: ...rd wheeled undercarriage has been removed the floats assembly can be atta ched directly to the fuselage no other modifications are required It is also possible at any time to remove the floats assembl...

Страница 4: ...u Respectez toutes les consignes de s curit et veillez particuli rement ne mettre personne en danger sur le plan d eau nageur personnes en calot etc Choisissez un plan d eau relativement tendu et un j...

Страница 5: ...rsehen Diese Kennungen finden sich an den Aufh ngungspunkten auf den Schwimmern wieder L linke Seite R rechte Seite Bild Fig 2 Die Querstreben in die Schwimmer schieben Insert the cross struts in the...

Страница 6: ...e M sur le fuselage pour le vissage des tais Bild Fig 8 Die zugeordneten vorderen St tzstreben mit Blechschrauben 2 4 x 8 mm montieren Schrauben noch nicht festziehen Attach the assigned front support...

Страница 7: ...inkage Vue d ensemble de l asservissement des gouvernails Bilder Figs 17 18 Die Gummiringe f r die R ckstellung in den sen der Schwimmer bzw an den Rudern innen einh ngen Anlenkseile an den Rudern anb...

Страница 8: ...les vis des accouplements Contr lez la position neutre des gouvernails Le mod le est pr t effectuer son premier d collage de l eau Modellbau Lindinger GmbH Industriestra e 10 4565 Inzersdorf im Kremst...

Отзывы: