13
Section 3 - Sharks Fin I
nstal
lation
ca. 104
0 mm
ca.1040
mm
178
0 -
198
0 m
m
Search for the rafters at the position of the collector field. Push up or remove tiles on the total length
of the collector field.
Using the wood screws provided mount the support pipe using the pipe brackets. The distance
between the lower batten and pipe centre should be 90mm. If more panels are added use the
extension bolts to join the pipes. Extensions must be mounted with 2 pipe brackets [4]. The end
brackets should not be more than 500mm from the end of the support pipe.
max 500mm
90 m
m
2
2
3
1
1
1
2
4
17