Setting the Operational Parameters in Edit Mode • 16
4. The COPY LED will be steadily on or off and the CHARGE LED will be blinking
green if the SDM-E2 is operating properly or solid red if there is a system
failure. The amount of free memory in the SDM-E2 will dictate the condition of
the COPY LED (see “Available Memory in the SDM-E2” on page 69).
5. Install an EAGLE 2 in the instrument cradle. Set the EAGLE 2 onto the top of
the SDM-E2 and slide the instrument forward until it falls into place as
illustrated.
WARNING:
Inserting the EAGLE 2 improperly may damage the exhaust bellow at the
back of the SDM-E2.
Figure 10: Inserting the EAGLE 2
6. If the EAGLE 2 is equipped with NiMH batteries and you wish to charge the
batteries, connect the charging cable at the front of the SDM-E2 to the
charging jack on the back of the instrument. The CHARGE LED will begin
flashing amber. If the batteries are fully charged, the CHARGE LED will
become solid green again after about 5 minutes. Typically a bump test or
calibration will be initiated before this happens. See “Charging an Instrument in
a Docking Station” on page 66 for a complete description of charging the
EAGLE 2.
C
a
li
b
ra
ti
o
n
S
ta
tio
n
CO
P
Y
E
A
GL
E
2
OF
F
CH
A
R
G
E
1 S
E
C
O
N
3 S
E
C
O
F
F
CA
L
ED
IT
EN
T
E
R
PO
W
E
R
SD
M
-E
2
BU
M
P
A
IR
Y
E
S
R
A
N
G
E
S
H
I
F
T
P
O
W
E
R
E
N
T
E
R
R
E
S
E
T
D
IS
P
L
A
Y
A
D
J
U
S
T
N
O