background image

 

12 • 35-3001A-01-03 Methane Sample-Draw Detector

6. If necessary, use a small flat-blade screwdriver to adjust the zero potentiometer until the 

voltmeter reading is 100 mV (± 2 mV).

7. Remove the voltmeter leads from the test points.
8. Close the housing door.

Maintenance

This section describes maintenance procedures. It includes preventive maintenance procedures. 
This section also includes procedures to troubleshoot the sample-draw detector, replace 
components of the sample-draw detector, adjust the low flow setting, and remove the particle 
filter’s tubing stub.

Preventive Maintenance

This section describes a preventive maintenance schedule to ensure the optimum performance of 
the sample-draw detector. It includes daily, monthly, and biannual procedures.

Daily Visual Checks

1. Verify that the Pilot LED is on.

2. Verify that the flowmeter indicates a flow rate of approximately 1.0 SCFH. If necessary use the 

sensor flow control valve to adjust the flow rate to 1.0 SCFH. Turn the valve’s knob 
counterclockwise to increase the flow and clockwise to decrease the flow.

3. Verify a display reading of 0% volume at the controller or a reading of 100 mV at the amplifier 

test points. Investigate significant changes in the display reading.

Monthly Response Test

This procedure describes a test to verify that the sample-draw detector responds properly to the 
target gas.

NOTE:

To reduce the response time of this test, use a short incoming sample line. If the sample-
draw detector’s sample line is long, connect a shorter line for this test. Make sure you 
reconnect the sample line after you complete this procedure.

NOTE:

Performing a response test on the sample-draw detector may cause alarms. Be sure to put 
the controller into its calibration program or disable external alarms before performing 
this test.

Preparing for the response test

NOTE:

This procedure describes the RKI calibration kit that includes a demand flow regulator.

1. Verify that the display reading at the controller is 0% volume.

If the display reading is not 0% volume, set the zero reading as described in “Calibration” on 
page 18, t
hen continue this procedure.

2. Set a voltmeter to measure in the millivolt (mV) range.

3. Open the housing door, then plug the voltmeter leads into the test points on the amplifier.

Plug the positive lead into the red (+) test point; plug the negative lead into the black (-) test 
point.

Содержание 35-3001A-01-03

Страница 1: ...www rkiinstruments com 35 3001A 01 03 Methane Sample Draw Detector Operator s Manual Part Number 71 0447 Revision P1 Released 10 30 17...

Страница 2: ...riodic calibration and maintenance of the detector is essential for proper operation and correct readings Please calibrate and maintain this detector regularly Frequency of calibration depends upon th...

Страница 3: ...eplacement costs local repair costs transportation costs or contingent expenses incurred without our prior approval THIS WARRANTY IS EXPRESSLY IN LIEU OF ANY AND ALL OTHER WARRANTIES AND REPRESENTATIO...

Страница 4: ...Draw Detector to a Controller 9 Start Up 11 Introducing Incoming Power 11 Setting the Zero Reading 11 Maintenance 12 Preventive Maintenance 12 Troubleshooting 13 Replacing Components of the Methane Sa...

Страница 5: ...e operation of the 35 3001A 01 03 and to minimize the risk of personal injury Be sure to maintain and periodically calibrate the 35 3001A 01 03 as described in this manual Table 1 Specifications Targe...

Страница 6: ...or PCB IR CH4 Flow Block W L E L G B R Pilot LED Fail LED Sensor Flow Control Valve W Interconnect Terminal Strip Pump Reset Switch Flowmeter B G AMP 2 S S AMP 1 R W G OXY Hydrophobic Filter Particle...

Страница 7: ...mple fittings accept 1 4 in rigid tubing See the Installation section on page 7 to connect tubing to the sample fittings Particle Filter A particle filter with a tubing stub on one end is shipped with...

Страница 8: ...t corner of the main circuit board Use the pump connector to connect the pump to the main circuit board NOTE The pump is factory wired to the main circuit board See Installation on page 7 for all wiri...

Страница 9: ...gain press and hold the pump reset switch for about 2 seconds then release Hydrophobic Filter The hydrophobic filter is located toward the bottom left of the main circuit board The filter prevents par...

Страница 10: ...just the amplifier s gas response output during the calibration procedure Turn the adjustment screw clockwise to increase the span output and counterclockwise to decrease the span output CAUTION The a...

Страница 11: ...owing when you select the mounting site Is there enough room to open the housing door and make wiring and tubing connections at the bottom of the housing Make sure there is sufficient room to perform...

Страница 12: ...g components 4 Connect a length of sample tubing to the other side of the particle filter and route it to the sampling area 1 4 O D rigid polypropylene Teflon or flexible polyurethane tubing may be us...

Страница 13: ...t to seal the connection between the tubing and the inlet fitting 3 Hand tighten the nut on the exhaust fitting so the ferrules clamp on the tubing If the tube nut is removed see Figure 6 for the arra...

Страница 14: ...ing the Sample Draw Detector to a Controller 9 If shielded cable is used connect the cable s drain wire to an available chassis earth ground at the controller RKI controllers typically have a ground s...

Страница 15: ...this test 7 Verify that the incoming sample line is not leaking To test the sample line press and hold the reset switch and plug the open end of the sample line with your thumb If the flowmeter ball d...

Страница 16: ...ay reading of 0 volume at the controller or a reading of 100 mV at the amplifier test points Investigate significant changes in the display reading Monthly Response Test This procedure describes a tes...

Страница 17: ...n a safe place Biannual Calibration Calibrate the sample draw detector as described in Calibration on page 18 Troubleshooting The troubleshooting guide describes symptoms probable causes and recommend...

Страница 18: ...nt demand flow regulator to determine if the original one is functioning properly 3 If necessary set the correct flow rate with the sensor flow control valve 4 If you cannot set the correct flow rate...

Страница 19: ...om the main circuit board 7 Install the new amplifier in the same orientation as the old amplifier See Figure 1 8 Reinstall the screw lock washer and flat washer you removed in step 5 9 Install the de...

Страница 20: ...the particle filter 2 Disconnect the particle filter from the tubing stub 3 Install the new particle filter onto the tubing stub Be sure the arrow on the particle filter is pointing toward the inlet...

Страница 21: ...kwise Repeat steps 3 and 4 if necessary 5 Use the sensor flow control valve to set the flow to 1 0 SCFH 6 Make sure the sample draw detector s Fail LED is off Removing the Particle Filter s Tubing Stu...

Страница 22: ...libration frequency of every 6 months If an application is not very demanding for example detection in a clean temperature controlled environment where calibration adjustments are minimal at calibrati...

Страница 23: ...next section Setting the Response Reading 5 Disconnect the sample tubing from the inlet line 6 Unscrew the regulator from the zero air calibration cylinder Setting the Response Reading 1 Screw the re...

Страница 24: ...K Hydrophobic filter 33 0167RK Particle filter 57 1053RK 10 Amplifier 61 5041RK CH4 Infrared methane sensor plug in type vol range 71 0447 Operator s Manual 35 3001A 01 03 Sample Draw Detector 81 0013...

Отзывы: