background image

IMS01P12-E1 

 

7

6.3 CC-Link Connection 

 

Method to connect 

The PLC (master station) and V-TIO-L/V-TIO-M module make 
multi-drop connection in CC-Link dedicated cable Ver. 1.10. 

 

 

CC-Link dedicated cable 
Ver.1.10 

Up to 61 stations 

PLC 

Master station 

Terminating

resistor 

Station to station cable length: 20 cm or more 

Terminating 

resistor 

 

 

 

Terminal numbers and signal details 

The CC-Link connecting terminal cannot do on-line 
installation or dismount for terminal block of 
dismount impossibility. This instrument exchanges 
all the links after being downed. In addition, FG 
(flame gland) terminal of terminal number 5 is FG in 
a CC-Link function, and it is not FG of instrument all.

 

 

Ground both ends of the shield wire on the twisted 
pair cable via the SLD or FG terminal of each 
module. In addition, the SLD terminal is internally 
connected with the FG terminal. 

 

Do not ground the instrument together with other 
equipment. In addition, use grounding wires with 
across section of 2.0 mm

or more. 

(Ground resistance: 100 ohm or less)

 

 

CC-Link connection terminals 

1: DA 

2: DB 

3: DG 

4: SLD 

5: FG 

Terminal screws 

Screw size: M3 
Recommended tightening torque: 
 0.4 

N

m (4 kgf

cm) 

 

 

Terminal No. 

Signal name 

Symbol 

Cable color

1 Data 

DA 

Blue 

2 Data 

DB 

White 

3 Data 

ground 

DG 

Yellow 

4 Shield 

SLD 

Grounding wire

(Shield) 

5 Frame 

ground

FG 

 

 

For cable specifications, connection method and vendor, 
refer to the home page of CC-Link Partner Association. 

URL: http://www.cc-link.org/ 

 

 

Connection diagram 

 

CC-Link dedicated 
cable Ver.1.10 

CC-Link dedicated 
cable Ver.1.10 

DA 

DB 

DG 

SLD 

FG 

DA 

DB 

DG 

SLD 

FG 

DA

DB

DG

SLD

FG

V-TIO-L/V-TIO-M 

module 

Master station 

V-TIO-L/V-TIO-M 

module 

TR: Terminating resistor

(110 

 

 5 % 1/2 W)

TR 

TR

 

 

Always connect a terminating resistor between the DA and 
DB terminals of the module to be located at the far end. 

6.4 Event Input/Output Connector 

 

Connector pin configuration 

This is a connector installed in the V-TIO-L/V-TIO-M module only 
when provided with the event input (optional) or the event output 
(optional). 

 

 

Event connector   

(socket) 

 

 

 

Circuit configuration 

 

 

24 V DC 

1

2

3

DI

4

5

6

Load

DO1 

DO2 

Load

 

 

 

Attention in connector (plug) wiring 

  Use the following connector (plug) as that connected to the 

event connector.   
Connector (plug) is sold separately. 

SRVP-01 (Front-screw type) 
SRVP-02 (Side-screw type) 

  The lead wires use the stranded wire. 

  Use the stranded wire from size 0.2 to 2.5 mm

2

 (AWG 24-12). 

  Stripping length is as follows.

 

SRVP-01: 10 mm 
SRVP-02: 7 mm 

  Recommended tightening torque of the lead wire in the 

connector (plug):  0.5 to 0.6 N

m (5 to 6 kgf

cm) 

Screw size:  SRVP-01:  M2.5 
 SRVP-02: 

M3 

 

[SRVP-01] Front-screw type 

[SRVP-02] Side-screw type

Stripping length

10 mm 

Stranded wire size: 
 0.2 

to 

2.5 

mm

 (AW G 

24-12) 

Recommended tightening 
torque:  0.5 to 0.6 N

 

(5 to 6 kgf

cm) 

Stripping length

7 mm 

Stranded wire size: 
 

0.2 to 2.5 mm

 (AW G 

24-12) 

Recommended tightening 
torque:  0.5 to 0.6 N

 

(5 to 6 kgf

cm) 

 

 
 

 

 

Pin 
No. 

Description 

Digital input (DI)  (

Digital input (DI)  (

Digital output (DO) 1 
(Relay contact output)

Digital output (DO) 2 
(Relay contact output)

 

 

 

Содержание V-TIO-L

Страница 1: ...to avoid electric shock by operating personnel All precautions described in this manual should be taken to avoid damage to the instrument or equipment All wiring must be in accordance with local codes and regulations All wiring must be completed before power is turned on to prevent electric shock instrument failure or incorrect action The power must be turned off before repairing work for input br...

Страница 2: ... 0 to 400 C KB9 32 to 752 F K04 0 to 800 C KB8 32 to 1472 F K16 200 to 1372 C KB7 328 to 2501 F K09 0 0 to 400 0 C KC2 32 0 to 752 0 F K35 200 0 to 400 0 C KC1 328 0 to 752 0 F J J02 0 to 400 C JC2 32 to 752 F J04 0 to 800 C JC1 32 to 1472 F J15 200 to 1200 C JB9 328 to 2192 F J09 0 0 to 400 0 C JC4 32 0 to 752 0 F J27 200 0 to 400 0 C JC3 328 0 to 752 0 F T T08 0 to 400 C TB9 32 to 752 F T09 0 to...

Страница 3: ...flashing 1 second cycle RUN When normally for internal communication A green lamp turns on When abnormally for internal communication A green lamp is flashing 0 5 seconds cycle In validation of the module which it connected just after the power is turned on A green lamp is flashing 0 1 seconds cycle When CC Link communication stopped state A green lamp turns off SD During CC Link data send A green...

Страница 4: ...e rotary switch which there is on the left side of module select communication speed for CC Link For this setting use a small slotted screwdriver Setting range 0 to 4 Factory set value 0 Communication speed setting switch Left side view CC Link side Communication speed and maximum transmitter distance maximum length of Network Use CC Link dedicated cable Ver 1 10 Communication speed setting Commun...

Страница 5: ...ecting device for the equipment 5 2 Dimensions Unit mm 6 8 40 5 110 125 78 5 8 2 The above figure shows when provided with the event input output connector but the same also when not provided with the connector 5 3 DIN rail Mounting Mounting procedures 1 Pull down the mounting bracket at the bottom of the module A Attach the hooks on the top of the module to the DIN rail and push the lower section...

Страница 6: ...60950 1 A suitable power supply should be considered in the end use equipment The power supply must be in compliance with a limited energy circuits maximum available current of 8 A In the maximum configuration extension up to 31 modules the 24 V DC supplied equipment may draw up to 4 A The power supply shall be capable of delivering at least 4 A Use the solderless terminal appropriate to the screw...

Страница 7: ...iation URL http www cc link org Connection diagram CC Link dedicated cable Ver 1 10 CC Link dedicated cable Ver 1 10 DA DB DG SLD FG DA DB DG SLD FG DA DB DG SLD FG V TIO L V TIO M module Master station V TIO L V TIO M module TR Terminating resistor 110 5 1 2 W TR TR Always connect a terminating resistor between the DA and DB terminals of the module to be located at the far end 6 4 Event Input Out...

Страница 8: ...ctable Specify when ordering Additional function Autotuning function Events Number of events 2 points channel Event type Temperature event Deviation high Deviation low Deviation high low Band Process high Process low Heater break alarm HBA Control loop break alarm LBA Burnout Temperature rise completion Heater break alarm HBA function Number of HBA 2 points Setting range 0 0 to 100 0 A 0 0 A OFF A...

Отзывы: