WWW.RSIWW.COM
3 of 45
Safety Advice
General Order of Assembly
Tools Needed
Table of Contents
•
The greenhouse must be positioned and fixed on a flat
level surface.
•
Dispose of all plastic bags safely. Keep them out of the
reach of small children.
•
Keep children and pets away from the assembly area until
the work is completed.
•
Always wear work shoes, gloves and safety goggles when working.
•
Some of the parts have sharp edges and burs. Use extreme
caution when handling.
•
Do not lean against or push the greenhouse during assembly.
•
Take special care not to touch overhead power lines with the
aluminum profiles.
•
Do not attempt to assemble the greenhouse in windy or wet
conditions.
•
Do not position your greenhouse in an area exposed to
excessive wind.
•
If using power tools or a step ladder, always follow the
manufacturer’s safety instructions.
•
Hot items such as recently used grills, blow torches etc.,
must not be stored in the greenhouse.
•
Store the polycarbonate panels in a cool dark place such as a
garage until you are ready to use them.
•
Make sure the greenhouse complies with local building codes.
•
Heat the greenhouse during winter months to avoid accumulation
of snow or ice on the roof.
Step 1: Assemble Base
Step 2: Assemble Right Wall
Step 3: Assemble Back Wall
Step 4: Assemble Left Wall
Step 5: Assemble Front Wall and Gable
Step 6: Assemble Back Gable
Step 7: Assemble Roof Ridge
Step 8: Assemble Roof
Step 9: Install Roof Vents
Step 10: Assemble and Install Doors
Step 11: Secure to Platform
4
9
9
9
2
8
7
6
11
1
10
3
5
•
Step Ladder
•
Work Gloves
•
Safety Goggles
•
Spirit Level
•
Tape Measure
•
23 1/8 inch spacer (included)
•
7
/
16
” wrench (included)
•
Phillips Screwdriver (included)
•
Flat Screwdriver (included)
•
5 foot bungee cord (included)
•
clear silicone caulk tube
Warranty .................................................... 1
Introduction ............................................. 2
Safety Advice ........................................... 3
General Order of Assembly ................. 3
Construct Wood Platform .................... 4
List of Parts................................................ 5
Using T-bolts............................................. 8
Assemble Base ......................................... 9
Assemble Right Wall .............................. 12
Assemble Back Wall ............................... 16
Assemble Left Wall ................................. 19
Assemble Front Wall and Gable ........ 22
Assemble Back Gable ............................ 28
Assemble Roof Ridge ............................ 30
Assemble Roof ......................................... 32
Install Roof Vents .................................... 40
Assemble and Install Doors ................ 42
Secure to Platform ................................. 45