WWW.RSIWW.COM
43 of 45
NOTE: VIEW FROM OUTSIDE.
NOTE: VIEWS FROM OUTSIDE.
IMPORTANT: Make sure door is level. When
necessary loosen screws holding D-8 hinge
to F-8 profile and repostion until it is level.
Install left door assembled in step 10.3. Line up
holes in D-8 hinges with holes in E-2 door profile.
Secure each hinge with two S-9 screws and make
sure door is level. Make sure D-7 latch fits into
B-3 connector to lock doors.
Working from the outside with doors all the
way open, apply the D-4 door sealant
tape to the outside of F-8 and F-5
profiles that make up the door
frame and to inside E-1
bottom door profiles.
This tape acts as
insulation. Make sure
it is smooth and even.
Working from inside, with left door open and right door closed. Attach D-10 spring to hole in E-1
door profile using one S-9 screw. Strech spring and attach other side to T-bolt on F-8 profile.
Secure with S-2C cap.
Close left door and repeat step 10.6 A to
install spring on other door. The springs will
pull the doors closed.
10.4A
10.4B
10.5
10.6A
10.6B
NOTE: VIEWS FROM INSIDE.
S-9
S-9
E-2
F-8
D-9
D-7
B-3
S-9
8
Connector
QTY
F-8
E-1
E-1
P-1B
P-1A
F-8
F-5
D-4
D-4
D-4
D-4
D-4
D-4 20’
Door Sealant Tape QTY
E-2
E-3
E-3
S-9
D-10
D-10
F-8
S-2C
D-10
S-9
2
2
Connector
QTY
S-2C
2
Connector
QTY