WWW.RSIWW.COM
32 of 48
NOTE: VIEWS FROM OUTSIDE.
WARNING: Use two people to install roof ridge. Place ladder in inside of greenhouse.
One person will stand on the ladder holding the ridge with screws FACING UP until
it is in the proper position. Turn over so bolts face down and secured in place.
Use two people and a step ladder. Place step ladder inside greenhouse. Hold
the roof ridge with the screws FACING UP until it is in position. Have one
person inside greenhouse supporting ridge as you slide it into position.
Avoid touching top of front and back of greenhouse until each end is
flush with ends of front and back profiles. Turn the roof ridge over
so bolts face down and rest on top of front and back walls.
7.3A
Working from outside, ensure all pieces are still flush and secure roof ridge to front. Loosen set
screws and adjust position to fit holes in C-2 connector. Secure with three bolts.
7.5A
Working from inside, secure roof ridge to front end wall. Loosen T-bolts and adjust position
to fit holes in B-7 connector. Secure with two bolts.
7.4A
Repeat step 7.5A to secure back.
7.5B
Repeat step 7.4A to secure back.
7.4B
Make sure end of roof ridge is
flush to profiles on front and back.
7.3B
NOTE: VIEWS FROM INSIDE.
R-1E
R-1E
R-1E
R-1E
R-1
R-1
R-1
F-7
F-7
F-7
F-7
B-7
S-2C
4
Connector
QTY
B-7
2
C-2
In some cases the corner points
might need to be trimmed down if
roof ridge is sitting on points.
See orange.
Connector
QTY
S-7
C-2
S-2C
6
2
6