background image

 

 

 

 
 

BEFORE YOU START: 

 

 

Read all instructions carefully 

 

Identify all parts and check quantities against parts list 

 

Select a level site 

 

Do not mark cladding with pencil as lead can cause corrosion to cladding 

 

 

SAFETY: 

 

 

Do not attempt to build your shed in high winds 

 

Beware of sharp edges, recommend use of gloves 

 

Protect your eyes and ears 

 

For ease of assembly, use a friend to help 

 

 

 

TOOLS REQUIRED: 

 
 

 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

WARRANTY REQUIREMENTS

 

 

Following are the minimum requirements for cladding used in Smartstore Sheds. 

 

 

Wash all surfaces annually using a hose and soft nylon brush. 

 

Within 2 km of coast – wash every 3 months as above. After a storm, wash the cladding and the gutters as soon 
as possible to remove any highly corrosive salt deposits. 

 

Volcanic Ash Fallout – wash as soon as possible, removing fall out from roof and gutters. 

 

Do not allow manures, chemicals or other corrosive materials to have direct contact with cladding

.

 

DRILL 

RIVETER 

PHILLIPS DRILL BIT 

3.5 DRILL BIT 

HAMMER 

LADDER 

TAPE MEASURE 

PEN 

NAIL PUNCH 

CONGRATULATIONS ON PURCHASING A DURATUF SMARTSTORE SHED.  

BEFORE YOU BEGIN THE ASSEMBLY PLEASE NOTE SOME IMPORTANT POINTS: 

Содержание SmartStore SS2520

Страница 1: ...ASSEMBLY INSTRUCTIONS SS2520 BASE SIZE 2 520m x 2 020m...

Страница 2: ......

Страница 3: ...cladding used in Smartstore Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as soon...

Страница 4: ...55 m 2 Roof 2 200 m 5 Barge 1 100 m 4 Door 3 4 Sheet 1 810 m 2 Ridge Flashing 1 550 m 2 TIMBER Padbolt Support 0 140 m 1 Bottom Plates H4 Green Front Back 2 520 m 2 Spouting 2 550 m 2 Bottom Plates H4...

Страница 5: ...te Front Bottom Plate Side Back Wall Sheets Front Wall Sheets Door Jambs Front Wall Sheet Door Side Flashing Hinge Door Brace Door Top Bottom Channel Ridge Beam Jack Stud Ridge Flashings x 2 5 ASSEMBL...

Страница 6: ...oming through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bott...

Страница 7: ...Rivet sheets together STEP 2 Position door side flash ings and assemble door as shown Drill and rivet as per dia gram ensuring rivets penetrate into door sheet STEP 4 Rivet door brace flashings onto b...

Страница 8: ...s to the Top Plate at each end making sure that the top corners of the sheets are flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by approx 15mm as show...

Страница 9: ...te using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the...

Страница 10: ...ashing Ensure the door closes properly then fit remaining rivets STEP 3 Place 3 x Wall Sheets on timber plates and rivet the sheets together as shown Ensure that the top of the sheet is flush with the...

Страница 11: ...g someone to support the panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 4 x 40mm screws 2 per join screw the Top and Bottom Plates togeth...

Страница 12: ...the Jack Studs to the underside of the Ridge Beam one at each end fig 1 Turn the Ridge Beam Jack Stud assembly over and place it on the timber Top Plate in a central position Secure with 2 x 75mm scr...

Страница 13: ...pan into the Top Plate Repeat at the front ROOF ASSEMBLY CONT 12 STEP 4 Centralise the Roof at the right hand end with the Ridge Beam Using 3 x Weatherseal nails fix roof sheet to the Ridge Beam and f...

Страница 14: ...brackets evenly around the shed and fix to the Bottom Plate and the concrete slab A 10mm masonry drill bit is required OPTIONAL SENTRY FLOOR Position the Floor Joists centrally between the side Base...

Страница 15: ......

Страница 16: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Отзывы: