ASSEMBLE DOOR
6
SELECT:
2 x 1.810 m Door Sheets
2 x 0.945 m Door Top/Bottom Channels
2 x 1.810 m Door Side Flashings
3 x Hinges
1 x Padbolt Support Flashing
2 x 1.255 m Door Brace Flashings
36 x Rivets
STEP 1:
Lay out door sheets on a flat surface making sure narrow pans
are on the outside.
Slide door top and bottom channels on each end as shown in
fig. 1
Rivet sheets together.
STEP 2:
Position door side flash-
ings and assemble door
as shown.
Drill and rivet as per dia-
gram, ensuring rivets
penetrate into door sheet.
STEP 4:
Rivet door brace flashings onto back
of door as shown. Where possible,
rivet from front of door.
Ensure the door brace flashings are
at least 50mm from top and bottom of
door, and 10mm from the side to
clear top and bottom timber plate,
when hung.
fig.2
fig.1
STEP 3:
Attach hinges to door side
channel using rivets provided.
Using one rivet, attach padbolt
support as shown in
fig. 2
NARROW PANS
Содержание SmartStore SS2520
Страница 1: ...ASSEMBLY INSTRUCTIONS SS2520 BASE SIZE 2 520m x 2 020m...
Страница 2: ......
Страница 15: ......