background image

 

 

 

 

Riverlea Group Ltd warrant that the cladding used in the manufacture of the Smartstore shed will not rust within 15 years from the 
date of purchase. 
 

 

Any liability for product failure that may arise will be limited to repair or replacement of the defective product and will only apply for 
the benefit of the original purchaser. Riverlea Group Limited will not be liable for any consequential loss or damage, labour, or 
transport charges. 
 

 

This warranty is conditional on: 

 

Construction, installation and maintenance being carried out as specified in the Assembly Instruction Manual. 

 

The shed being installed in modest inland corrosion zones or areas where the steel corrosion rate is less than 200g/m2          
(as published by Branz). 

 

Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase.  

 

 

This warranty does not cover the following: 

 

Fastenings and fixings. 

 

Normal wear and tear, damage by impact or acts of God. 

 

Situations where the shed has been used for storage of chemicals, manure or corrosion causing products.

 

 

Unauthorized modification of the structure, including painting of the cladding.

 

 

Please visit http://www.riverleagroup.co.nz/warranty-garden-sheds to validate the Warranty on your shed. 
Click on the Warranty Registration Link and complete all details. 
 
If you are unable to access the computer, please phone us on 0800 438 274 and one of the customer services team 
will help you to activate the warranty on your garden shed.  
 
 

Many thanks, from the Team at Riverlea Group. 

15 YEAR WARRANTY

 

WARRANTY REGISTRATION

 

Содержание SmartStore SS2520

Страница 1: ...ASSEMBLY INSTRUCTIONS SS2520 BASE SIZE 2 520m x 2 020m...

Страница 2: ......

Страница 3: ...cladding used in Smartstore Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as soon...

Страница 4: ...55 m 2 Roof 2 200 m 5 Barge 1 100 m 4 Door 3 4 Sheet 1 810 m 2 Ridge Flashing 1 550 m 2 TIMBER Padbolt Support 0 140 m 1 Bottom Plates H4 Green Front Back 2 520 m 2 Spouting 2 550 m 2 Bottom Plates H4...

Страница 5: ...te Front Bottom Plate Side Back Wall Sheets Front Wall Sheets Door Jambs Front Wall Sheet Door Side Flashing Hinge Door Brace Door Top Bottom Channel Ridge Beam Jack Stud Ridge Flashings x 2 5 ASSEMBL...

Страница 6: ...oming through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bott...

Страница 7: ...Rivet sheets together STEP 2 Position door side flash ings and assemble door as shown Drill and rivet as per dia gram ensuring rivets penetrate into door sheet STEP 4 Rivet door brace flashings onto b...

Страница 8: ...s to the Top Plate at each end making sure that the top corners of the sheets are flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by approx 15mm as show...

Страница 9: ...te using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the...

Страница 10: ...ashing Ensure the door closes properly then fit remaining rivets STEP 3 Place 3 x Wall Sheets on timber plates and rivet the sheets together as shown Ensure that the top of the sheet is flush with the...

Страница 11: ...g someone to support the panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 4 x 40mm screws 2 per join screw the Top and Bottom Plates togeth...

Страница 12: ...the Jack Studs to the underside of the Ridge Beam one at each end fig 1 Turn the Ridge Beam Jack Stud assembly over and place it on the timber Top Plate in a central position Secure with 2 x 75mm scr...

Страница 13: ...pan into the Top Plate Repeat at the front ROOF ASSEMBLY CONT 12 STEP 4 Centralise the Roof at the right hand end with the Ridge Beam Using 3 x Weatherseal nails fix roof sheet to the Ridge Beam and f...

Страница 14: ...brackets evenly around the shed and fix to the Bottom Plate and the concrete slab A 10mm masonry drill bit is required OPTIONAL SENTRY FLOOR Position the Floor Joists centrally between the side Base...

Страница 15: ......

Страница 16: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Отзывы: