background image

 

 

ASSEMBLY INSTRUCTIONS

 

SL1520

 

BASE SIZE: 1.520m x 2.020m

 

Содержание Duratuf Sentry Sheds SL1520

Страница 1: ...ASSEMBLY INSTRUCTIONS SL1520 BASE SIZE 1 520m x 2 020m ...

Страница 2: ...CHECK OUT OUR ASSEMBLY VIDEO ...

Страница 3: ...ce process needs to be adhered to to qualify for the steel warranty of your Duratuf Sentry shed Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as soon as possible to remove any highly corrosive salt deposits Volcanic Ash Fallout wash as soon as possible removing fall out from roof and gu...

Страница 4: ... 2 Side Wall Angle 1 875m 2 Roof 2 200m 3 Door Sheet Narrow 1 940m 2 Door Sides 1 940m 2 Door Jamb 1 980m 1 Corner Door Jamb 1 980m 1 Door Brace 1 200m 2 Barge 2 200m 2 Spouting 1 555m 1 Door Top Bottom 0 945m 2 Hardware Pack 1 Touchup Paint Brush 1 DESCRIPTION QTY DIAGRAM CHECKED Checked Date 3 CLADDING FLASHINGS HARDWARE PACK 1 ...

Страница 5: ...PARTS LIST DESCRIPTION QTY DIAGRAM Front Back Bottom Plates H4 Green 1 520 m 2 Front Back Top Plate H1 Red 1 520 m 2 Side Wall Bottom Plates H4 Green 2 020 m 2 Side Wall Top Plates H1 Red 2 022m 2 PACK 2 TIMBER ...

Страница 6: ...IDE PANELS 1 LAY FOUNDATION 2 ASSEMBLE DOOR QUICK OVERVIEW Top Plate Back Side Wall Sheets Barge Flashing Spouting Roof Sheets Top Plate Side Top Plate Front Bottom Plate Front Bottom Plate Side Back Wall Sheets Front Wall Sheet Door Jambs Door Sheets Door Side Flashing Padbolt Support Door Brace Door Top Bottom Flashing ...

Страница 7: ...rough from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom plate and the concrete floor See note on page 8 80mm 100mm 7 5mm 20mm Concrete Floor Base Plate Wall Cladding 6 RAISED BASE PLATE OPTION For sheds placed on a raised concrete floor No doubt by now you will...

Страница 8: ...and assemble door as shown ensuring narrow face of flashing is on front as per fig 1 STEP 4 On the back of the door place door braces in posi tion as shown in fig 4 Ensure that the top and bottom ends of the braces are under the door flashings as shown in fig 5 and opposite ends of the braces overlap in the middle Rivet door brace flashings onto back of door as shown Where possible rivet from fron...

Страница 9: ...op of timber plates with bottom of sheets flush with each other Rivet sheets together on overlaps as shown STEP 3 Nail wall sheets to the Top Plate at each end making sure that the top of the sheets are flush with the top of the Top Plate and the sides of the wall sheet overhang the Top Plate by approx 15mm as shown Check that the Top Plate is straight then nail the wall sheet to the Top Plate two...

Страница 10: ...ith bottom of sheets flush with each other Rivet the sheets together on overlaps as shown STEP 3 Nail the wall sheets to the Top Plate at each end making sure that the top of the sheets are flush with the top of the Top Plate and that the sides of the wall sheets overhang the Top Plate by 15mm as shown Check that the Top Plate is straight then nail wall sheets to the Top Plate using two clouts per...

Страница 11: ...P 3 Place 1 x Wall Sheet on timber plates ensuring wall sheets fit underneath door jamb flashings Ensure that the top of the sheet is flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by 15mm as shown Nail wall sheets to Top Plate two clouts per pan Nail the wall sheet to the Bottom Plate making sure that the Plates are the correct distance apart and t...

Страница 12: ...e panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel as shown Using 2 x 40mm screws screw Top Plates together in the corner Using 2 x 40mm screws 2 per join screw the Bottom Plates together in the corner STEP 2 Repeat Step 1 with the second Side Panel ensuring that the Side Panel overlaps the Back Wall Panel STEP 3 Stand up the Front Wall Panel ...

Страница 13: ...Wall Sheets fig 2 STEP 3 Ensure the Front and Back Top Plates are straight Screw the roof sheets to the front back Top Plates using 1 x Roofing Screw per rib fig 2 STEP 4 Place barge flashings on roof at end of shed ensuring the diagonal trimmed end is at the front See diagram on pg 5 Rivet the Barge Flashings to the roof and the side wall using four rivets on top of barge and four into the side f...

Страница 14: ... UP REMOVE ALL DRILL FILINGS FROM ROOF WALLS AND CHANNELS THOROUGHLY FAILURE TO DO THIS WILL RESULT IN CORROSION AND COULD THEREFORE VOID THE WARRANTY FIT PADBOLT Rivet Padbolt to door and keeper onto Door Jamb as shown 13 YOUR DURATUF SENTRY SHED IS NOW COMPLETE RELAX FITTING A SENTRY FLOOR KIT OPTIONAL Position the Floor Joists equally between the side Base Plates and skew nail each end with two...

Страница 15: ......

Страница 16: ...cate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fastenings and fixings Normal wear and tear damage by impact or acts of God Situations where the shed has been used for storage of chemicals manure or corrosion causing products Unauthorized modification of the structure including painting of the cladding Please...

Отзывы: