background image

 

 

SELECT:

 

 

1 x 1.980 Wall Sheets

 

1 x 1.520 Top Plate (Red)

 

1 x 1.520 Bottom Plate (Green)

 

1 x 1.980 Door Jamb Flashing

 

1 x 1.980 Corner Door Jamb Flashing

 

16 x 30mm Galv Clouts

 

13 x Rivets

 

STEP 1:

 

 

• 

Lay out 1 x Top Plate and 1 x Bottom Plate on a flat 
surface as shown 

 

STEP 2:

 

 

• 

Using 2 x 30mm clouts, nail the Door Jamb Flashing and Cor-
ner Door Jamb Flashing, flush with the top of the Top Plate at 
the correct  measurement as shown in plan view.   Note the 
difference between left and right hand flashing. Pre drill holes 
using a 3.5mm drill bit.

 

 

• 

Check the distance between the top and bottom plates then use 
a further 2 x 30mm clouts to nail the Door Jamb Flashings to 
the bottom Plate. Pre drill holes.

 

STEP 4:

 

 

• 

Place the door on the panel (In open position, approx 
20mm below top of top plate). Using two rivets, rivet the top 
and bottom hinges to the Door Jamb Flashing, ensuring 
door closes properly. 

 

 

• 

Fit remaining rivets.

 

STEP 3:

 

 

• 

Place 1 x Wall Sheet on timber plates, ensuring wall sheets fit 
underneath door jamb flashings. 

 

 

• 

Ensure that the top of the sheet is flush with the top of the 
Top Plate and that the sides of the wall sheet overhang the 
Top Plate by 

15mm

 as shown. Nail wall sheets to Top Plate 

(two clouts per pan)

 

 

• 

Nail the wall sheet to the Bottom Plate making sure that the 
Plates are the correct distance apart and that the sides of the 
wall sheets overhang the Bottom Plate by 

15mm

.

 

 

• 

Drill & rivet Door Jamb Flashings to wall sheets using four 
rivets equally spaced on each side.

 

NOTE: 

The

 

Doorway is standard at the left

-

hand end but can 

be put on the right

-

hand end..

 

NOTE: 

Door can be hinged on either side.

 

ASSEMBLE FRONT PANEL

 

IMPORTANT—IF YOU CHOOSE TO RAISE YOUR TIMBER 

BASE PLATE –READ THE FOLLOWING;

 

 

For sheds with Raised Base Plate option only (see page 6), deduct 

30mm from measurement shown between Top and Bottom Plates on 
all wall panels, so cladding protrudes 20mm below bottom plate

.

 

BOTTOM PLATE

 

1948mm

 

1948mm

 

TOP PLATE

 

960mm

 

TOP PLATE

 

DOOR OPENING

 

15mm

 

15mm

 

Plan View

 

TOP

 

PLATE

 

DOOR

 

JAMB

 

NAIL

 

x3

 

x3

 

x3

 

15mm

 

530mm

 

10

 

Содержание Duratuf Sentry Sheds SL1520

Страница 1: ...ASSEMBLY INSTRUCTIONS SL1520 BASE SIZE 1 520m x 2 020m ...

Страница 2: ...CHECK OUT OUR ASSEMBLY VIDEO ...

Страница 3: ...ce process needs to be adhered to to qualify for the steel warranty of your Duratuf Sentry shed Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as soon as possible to remove any highly corrosive salt deposits Volcanic Ash Fallout wash as soon as possible removing fall out from roof and gu...

Страница 4: ... 2 Side Wall Angle 1 875m 2 Roof 2 200m 3 Door Sheet Narrow 1 940m 2 Door Sides 1 940m 2 Door Jamb 1 980m 1 Corner Door Jamb 1 980m 1 Door Brace 1 200m 2 Barge 2 200m 2 Spouting 1 555m 1 Door Top Bottom 0 945m 2 Hardware Pack 1 Touchup Paint Brush 1 DESCRIPTION QTY DIAGRAM CHECKED Checked Date 3 CLADDING FLASHINGS HARDWARE PACK 1 ...

Страница 5: ...PARTS LIST DESCRIPTION QTY DIAGRAM Front Back Bottom Plates H4 Green 1 520 m 2 Front Back Top Plate H1 Red 1 520 m 2 Side Wall Bottom Plates H4 Green 2 020 m 2 Side Wall Top Plates H1 Red 2 022m 2 PACK 2 TIMBER ...

Страница 6: ...IDE PANELS 1 LAY FOUNDATION 2 ASSEMBLE DOOR QUICK OVERVIEW Top Plate Back Side Wall Sheets Barge Flashing Spouting Roof Sheets Top Plate Side Top Plate Front Bottom Plate Front Bottom Plate Side Back Wall Sheets Front Wall Sheet Door Jambs Door Sheets Door Side Flashing Padbolt Support Door Brace Door Top Bottom Flashing ...

Страница 7: ...rough from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom plate and the concrete floor See note on page 8 80mm 100mm 7 5mm 20mm Concrete Floor Base Plate Wall Cladding 6 RAISED BASE PLATE OPTION For sheds placed on a raised concrete floor No doubt by now you will...

Страница 8: ...and assemble door as shown ensuring narrow face of flashing is on front as per fig 1 STEP 4 On the back of the door place door braces in posi tion as shown in fig 4 Ensure that the top and bottom ends of the braces are under the door flashings as shown in fig 5 and opposite ends of the braces overlap in the middle Rivet door brace flashings onto back of door as shown Where possible rivet from fron...

Страница 9: ...op of timber plates with bottom of sheets flush with each other Rivet sheets together on overlaps as shown STEP 3 Nail wall sheets to the Top Plate at each end making sure that the top of the sheets are flush with the top of the Top Plate and the sides of the wall sheet overhang the Top Plate by approx 15mm as shown Check that the Top Plate is straight then nail the wall sheet to the Top Plate two...

Страница 10: ...ith bottom of sheets flush with each other Rivet the sheets together on overlaps as shown STEP 3 Nail the wall sheets to the Top Plate at each end making sure that the top of the sheets are flush with the top of the Top Plate and that the sides of the wall sheets overhang the Top Plate by 15mm as shown Check that the Top Plate is straight then nail wall sheets to the Top Plate using two clouts per...

Страница 11: ...P 3 Place 1 x Wall Sheet on timber plates ensuring wall sheets fit underneath door jamb flashings Ensure that the top of the sheet is flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by 15mm as shown Nail wall sheets to Top Plate two clouts per pan Nail the wall sheet to the Bottom Plate making sure that the Plates are the correct distance apart and t...

Страница 12: ...e panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel as shown Using 2 x 40mm screws screw Top Plates together in the corner Using 2 x 40mm screws 2 per join screw the Bottom Plates together in the corner STEP 2 Repeat Step 1 with the second Side Panel ensuring that the Side Panel overlaps the Back Wall Panel STEP 3 Stand up the Front Wall Panel ...

Страница 13: ...Wall Sheets fig 2 STEP 3 Ensure the Front and Back Top Plates are straight Screw the roof sheets to the front back Top Plates using 1 x Roofing Screw per rib fig 2 STEP 4 Place barge flashings on roof at end of shed ensuring the diagonal trimmed end is at the front See diagram on pg 5 Rivet the Barge Flashings to the roof and the side wall using four rivets on top of barge and four into the side f...

Страница 14: ... UP REMOVE ALL DRILL FILINGS FROM ROOF WALLS AND CHANNELS THOROUGHLY FAILURE TO DO THIS WILL RESULT IN CORROSION AND COULD THEREFORE VOID THE WARRANTY FIT PADBOLT Rivet Padbolt to door and keeper onto Door Jamb as shown 13 YOUR DURATUF SENTRY SHED IS NOW COMPLETE RELAX FITTING A SENTRY FLOOR KIT OPTIONAL Position the Floor Joists equally between the side Base Plates and skew nail each end with two...

Страница 15: ......

Страница 16: ...cate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fastenings and fixings Normal wear and tear damage by impact or acts of God Situations where the shed has been used for storage of chemicals manure or corrosion causing products Unauthorized modification of the structure including painting of the cladding Please...

Отзывы: