10. Pipe Connections
The Riva boiler is supplied with a 3/4” stainless steel gas pipe (A in
fi
gure 10.1), 2 - 3/4” cop-
per pipe (C,D in
fi
gure 10.1),2 – 1/2” (F,G in
fi
gure 10.1), located in a plastic bag in the boiler
package.
Figure 10.1
A) Stainless steel gas pipe
B) Main circuit drain cock
C) C.h. supply copper pipe
D) C.h. return copper pipe
E) C.h. PRV discharge copper pipe
F) D h w outlet copper pipe
G) D h w supply copper pipe
Installation:
• Remove the protective caps off boiler connections (Figure 10.1).
• Thoroughly clean the connections.
• Attach the supplied components to the boiler connections (see Figures 10.1). Be sure to
use the proper gaskets for the pipe connections.
• Before connecting the boiler to the heating system piping, review the suggested piping dia-
grams in Section 4 (page 11).
• If the c.h. system is above the boiler level, it is advisable to install c.h. cocks close to the
boiler for servicing operation.
• A hot water boiler installed above radiation level or as required by the Authority having juris-
diction, must be provided with a low water cutoff device elther as part of the boiler or at the
time of boiler installation.