HL-800 HYDRAULIC DOCK LEVELER
20
Pub. No. 1167-R2 - April 2003
INSTALLATION INSTRUCTIONS - CONTINUED
COMPLETION
ANCHOR PLATE
(SUPPLIED BY OTHERS)
DETAIL "U"
1. Raise leveler and engage maintenance support.
2. Remove lip supports from front frame angle (right side).
3. Disengage maintenance support and lower leveler to below dock position.
4. Manually raise platform until it is level with dock floor and support leveler.
5. Locate and weld lip supports to front pit steel as shown in Detail "T". NOTE: If front curb steel does not exist, anchor
plates must be used. See details below. (Supplied by others)
6 Adjust the lip stop bolt to allow the lip to be centered on lip supports.
5/8" X 5 LONG
ANCHOR. QTY 4
(SUPPLIED BY OTHERS)
6
1
8
Ø 3/4
13 1/2
3
LIP SUPPORT INSTALLATION (20" LIPS ONLY)
DETAIL "T"
WITH PIT STEEL
WITHOUT PIT STEEL
1/4
2 PLACES
2 PLACES
1/4
13 1/2
Figure - 18 Lip Support Installation
Содержание LEVEL-RITE HL-800 Series
Страница 4: ...HL 800 HYDRAULIC DOCK LEVELER 4 Pub No 1167 R2 April 2003 NOTES...
Страница 38: ...HL 800 HYDRAULIC DOCK LEVELER 38 Pub No 1167 R2 April 2003 PLATFORM REPLACEMENT PARTS DRAWING 14 8...
Страница 45: ...HL 800 HYDRAULIC DOCK LEVELER Pub No 1167 R2 April 2003 45 NOTES...
Страница 46: ...HL 800 HYDRAULIC DOCK LEVELER 46 Pub No 1167 R2 April 2003 NOTES...
Страница 48: ...By Rite Hite 8900 N Arbon Dr Milwaukee Wisconsin 53223 USA 414 355 2600...