background image

10.

Mount all signs and electrical components as shown
in figure 6.

CONTROL BOX AND CONDUIT 

INSTALLATION PROCEDURES

.

11.  Install the control box on a wall adjacent to the

overhead door at approximately 48" above the floor
level. See Figure 6.

12. Drill a hole for the power supply conduit (by others) in

the bottom of the control box. 

All holes drilled

through the control box must be through the
bottom of the box.

Warning Decal

20"

drive approach

of dock

and

DOK-LOK

standard

outside

sign

48"

80"

96"

1"

mirror
image

outside

sign

18"

outside

lights

15"

inside light &

control box

inside sign

disconnect (supplied by others)

place control box where

best suited within arms

reach at eye level near

door opening

dock seal

5" Ref.

FIGURE 6 - SUGGESTED COMPONENT LOCATION

Pub. No. 1327 — January 2014

7

RITE-HITE

®

VBR-600 DOK-LOK

®

Installation Manual

INSTALLATION CONT.

• When drilling holes in the box, DO NOT allow 

the drill to go too deeply into the box. 
Damage to the control systems may occur.

• DO NOT turn control box upside down to drill 

any access holes. Cover internal electrical 
components prior to drilling - this will prevent
debris from contacting the internal electrical 
components.

•  Remove all debris from box using a shop 

vacuum. NEVER use air to blow debris from 
the control box.

Содержание DOK-LOK VBR-600

Страница 1: ...0 Dok Lok Vehicle Restraint Installation Manual This Manual Covers Restraints Built After Serial Numbers VB6001000 and up PRINTED IN U S A RITE HITE PRINT SHOP PUBLICATION NO 1327 JANUARY 2014 MADE IN...

Страница 2: ...2 Pub No 1327 January 2014 RITE HITE VBR 600 DOK LOK Installation Manual NOTES...

Страница 3: ...ion exists The DOK LOK vehicle restriant is operated by pressing push buttons on an inside control panel NOTICE TO USER Your local Rite Hite representative provides a Planned Maintenance Program P M P...

Страница 4: ...o deteriorate or become unreadable Rite Hite Corporation does not recommend any particular lockout device but recommends the utilization of an OSHA approved device refer to OSHA regulation 1910 147 Ri...

Страница 5: ...ulic cylinder on the dock leveler is not over the opening of the Dok Lok cylinder clevis needs to be shimmed to pit floor to support hydraulic dock leveler 6 Route Dok Lok hydraulic hoses thru the bac...

Страница 6: ...unction box Ensure that the switch cable has enough slack to travel with the barrier through the entire locking range See figure 4 6 Pub No 1327 January 2014 RITE HITE VBR 600 DOK LOK Installation Man...

Страница 7: ...de lights 15 inside light control box inside sign disconnect supplied by others place control box where best suited within arms reach at eye level near door opening dock seal 5 Ref FIGURE 6 SUGGESTED...

Страница 8: ...t may produce condensation c Spacers should be installed between the enclosure and the wall to provide tempature insulation and air flow 13 Connect wiring as indicated by the Electrical Schematic and...

Страница 9: ...L B RED WIRES WHITE WIRE WHITE WIRE DETAIL B IN LEVELER PIT SUPPLIED BY OTHERS JUNCTION BOX RIG SENSOR WIRE SECURE TO PIT FLOOR AND LEAVE 20 OF SLACK SO BARRIER CAN TRAVEL FULL RANGE STORED SENSOR WIR...

Страница 10: ...D R G LOCK UNLOCK ISA2 HS 3 HS 2 HS 1 1 L1 L2 MCOM M 1 SCOM SOL1 SOL2 CR4 CR5 250v 1A Fast Blow 250v 15A Slow Blow M 1 SOL1 SOL2 BLK WHT 120 VAC 0 23 AMPS BLK WHT 120 VAC 0 23 AMPS Solenoid 1 Position...

Страница 11: ...RIER CAN TRAVEL FULL RANGE STORED SENSOR WIRE SECURE TO PIT FLOOR WIRE TO POSITION CYLINDER FLOAT SOLENOID SOL 2 WIRE TO POSITION CYLINDER EXTEND SOLENOID SOL 1 WIRE TO DIVERT SOLENOID SOL 3 SW1 SW1 V...

Страница 12: ...M M 1 SCOM SOL1 SOL2 CR4 CR5 250v 1A Fast Blow 250v 15A Slow Blow M 1 SOL1 SOL2 BLK WHT 120 VAC 0 23 AMPS BLK WHT 120 VAC 0 23 AMPS Solenoid 1 Position Cyl Extend Solenoid 2 Position Cyl Float 10 Sol...

Страница 13: ...r extends Release LOCK button cylinder will retract 19 Press and Hold the UNLOCK button until the main and positioning cylinders extend Release unlock button main cylinder will retract 20 Tighten lift...

Страница 14: ...LY TOP FRONT RIGHT SIDE VIEW BOTTOM BACK RIGHT SIDE VIEW DOK LOK Main Cylinder Port DOK LOK Position Cylinder Port Leveler Lip Block Solenoid SOL 4 Leveler Ramp Cylinder Out Port DOK LOK Position Cyli...

Страница 15: ...NOTES Pub No 1327 January 2014 15 RITE HITE VBR 600 DOK LOK Installation Manual...

Страница 16: ...and operated within their rated capacities and or specified design parameters and not otherwise abused Periodic lubrication and adjustment is the sole responsibility of the owner This warranty is Rit...

Отзывы: