10.
Mount all signs and electrical components as shown
in figure 6.
CONTROL BOX AND CONDUIT
INSTALLATION PROCEDURES
.
11. Install the control box on a wall adjacent to the
overhead door at approximately 48" above the floor
level. See Figure 6.
12. Drill a hole for the power supply conduit (by others) in
the bottom of the control box.
All holes drilled
through the control box must be through the
bottom of the box.
Warning Decal
20"
drive approach
of dock
and
DOK-LOK
standard
outside
sign
48"
80"
96"
1"
mirror
image
outside
sign
18"
outside
lights
15"
inside light &
control box
inside sign
disconnect (supplied by others)
place control box where
best suited within arms
reach at eye level near
door opening
dock seal
5" Ref.
FIGURE 6 - SUGGESTED COMPONENT LOCATION
Pub. No. 1327 — January 2014
7
RITE-HITE
®
VBR-600 DOK-LOK
®
Installation Manual
INSTALLATION CONT.
• When drilling holes in the box, DO NOT allow
the drill to go too deeply into the box.
Damage to the control systems may occur.
• DO NOT turn control box upside down to drill
any access holes. Cover internal electrical
components prior to drilling - this will prevent
debris from contacting the internal electrical
components.
• Remove all debris from box using a shop
vacuum. NEVER use air to blow debris from
the control box.