INSTALLATION CONT.
ELECTRIC AND SIGN INSTALLATION
7.
Mount a waterproof junction box and stand alone
power unit, if equipped, to the pit floor near Dok-Lok
pit. See figure 4 & 5.
8.
Route and secure (SW2) stored sensor cable with
the Dok-Lok hydraulic hoses. Terminate into junction
box. See figure 4.
9.
Route and secure (SW1) R.I.G. sensor cable
leaving a minimum loop of 20”. Secure with stored
switch and hoses. Terminate into junction box.
Ensure that the switch cable has enough slack to
travel with the barrier through the entire locking
range. See figure 4.
6
Pub. No. 1327 — January 2014
RITE-HITE
®
VBR-600 DOK-LOK
®
Installation Manual
Attach Main
Cylinder (#6 Hose)
Here
Attach Positioning
Cylinder (#4 Hose)
Here
Prefered Hose Routing
Behind Cylinder Support
Wire Tie Hoses
These Locations
Positioning Cylinder
#4 Hose
Stored Sensor Switch
RIG Sensor Switch
(Min 20" Loop)
Spring Adjustment Nut
Main Cylinder
#6 Hose
Alternate Hose
Routing Shown
4 x 4 x 3 NEMA 4 (Waterproof)
Juction Box
(Supplied By Others)
FIGURE 4 - ROUTING
FIGURE 5 - PUMP AND HOSE ROUTING