background image

INSTALLATION CONT.

ELECTRIC AND SIGN INSTALLATION

7.

Mount a waterproof junction box and stand alone
power unit, if equipped, to the pit floor near Dok-Lok
pit. See figure 4 & 5.

8.

Route and secure (SW2) stored sensor cable with
the Dok-Lok hydraulic hoses. Terminate into junction
box. See figure 4.

9.

Route and secure (SW1) R.I.G. sensor cable
leaving a minimum loop of 20”. Secure with stored
switch and hoses. Terminate into junction box.
Ensure that the switch cable has enough slack to
travel with the barrier through the entire locking
range. See figure 4.

6

Pub. No. 1327 — January 2014

RITE-HITE

®

VBR-600 DOK-LOK

®

Installation Manual

Attach Main 
Cylinder (#6 Hose)
Here

Attach Positioning
Cylinder (#4 Hose)
Here

Prefered Hose Routing
Behind Cylinder Support

Wire Tie Hoses
These Locations

Positioning Cylinder
#4 Hose

Stored Sensor Switch

RIG Sensor Switch
(Min 20" Loop)

Spring Adjustment Nut

Main Cylinder

#6 Hose

Alternate Hose

Routing Shown

4 x 4 x 3 NEMA 4 (Waterproof)

Juction Box

(Supplied By Others)

FIGURE 4 - ROUTING

FIGURE 5 - PUMP AND HOSE ROUTING

Содержание DOK-LOK VBR-600

Страница 1: ...0 Dok Lok Vehicle Restraint Installation Manual This Manual Covers Restraints Built After Serial Numbers VB6001000 and up PRINTED IN U S A RITE HITE PRINT SHOP PUBLICATION NO 1327 JANUARY 2014 MADE IN...

Страница 2: ...2 Pub No 1327 January 2014 RITE HITE VBR 600 DOK LOK Installation Manual NOTES...

Страница 3: ...ion exists The DOK LOK vehicle restriant is operated by pressing push buttons on an inside control panel NOTICE TO USER Your local Rite Hite representative provides a Planned Maintenance Program P M P...

Страница 4: ...o deteriorate or become unreadable Rite Hite Corporation does not recommend any particular lockout device but recommends the utilization of an OSHA approved device refer to OSHA regulation 1910 147 Ri...

Страница 5: ...ulic cylinder on the dock leveler is not over the opening of the Dok Lok cylinder clevis needs to be shimmed to pit floor to support hydraulic dock leveler 6 Route Dok Lok hydraulic hoses thru the bac...

Страница 6: ...unction box Ensure that the switch cable has enough slack to travel with the barrier through the entire locking range See figure 4 6 Pub No 1327 January 2014 RITE HITE VBR 600 DOK LOK Installation Man...

Страница 7: ...de lights 15 inside light control box inside sign disconnect supplied by others place control box where best suited within arms reach at eye level near door opening dock seal 5 Ref FIGURE 6 SUGGESTED...

Страница 8: ...t may produce condensation c Spacers should be installed between the enclosure and the wall to provide tempature insulation and air flow 13 Connect wiring as indicated by the Electrical Schematic and...

Страница 9: ...L B RED WIRES WHITE WIRE WHITE WIRE DETAIL B IN LEVELER PIT SUPPLIED BY OTHERS JUNCTION BOX RIG SENSOR WIRE SECURE TO PIT FLOOR AND LEAVE 20 OF SLACK SO BARRIER CAN TRAVEL FULL RANGE STORED SENSOR WIR...

Страница 10: ...D R G LOCK UNLOCK ISA2 HS 3 HS 2 HS 1 1 L1 L2 MCOM M 1 SCOM SOL1 SOL2 CR4 CR5 250v 1A Fast Blow 250v 15A Slow Blow M 1 SOL1 SOL2 BLK WHT 120 VAC 0 23 AMPS BLK WHT 120 VAC 0 23 AMPS Solenoid 1 Position...

Страница 11: ...RIER CAN TRAVEL FULL RANGE STORED SENSOR WIRE SECURE TO PIT FLOOR WIRE TO POSITION CYLINDER FLOAT SOLENOID SOL 2 WIRE TO POSITION CYLINDER EXTEND SOLENOID SOL 1 WIRE TO DIVERT SOLENOID SOL 3 SW1 SW1 V...

Страница 12: ...M M 1 SCOM SOL1 SOL2 CR4 CR5 250v 1A Fast Blow 250v 15A Slow Blow M 1 SOL1 SOL2 BLK WHT 120 VAC 0 23 AMPS BLK WHT 120 VAC 0 23 AMPS Solenoid 1 Position Cyl Extend Solenoid 2 Position Cyl Float 10 Sol...

Страница 13: ...r extends Release LOCK button cylinder will retract 19 Press and Hold the UNLOCK button until the main and positioning cylinders extend Release unlock button main cylinder will retract 20 Tighten lift...

Страница 14: ...LY TOP FRONT RIGHT SIDE VIEW BOTTOM BACK RIGHT SIDE VIEW DOK LOK Main Cylinder Port DOK LOK Position Cylinder Port Leveler Lip Block Solenoid SOL 4 Leveler Ramp Cylinder Out Port DOK LOK Position Cyli...

Страница 15: ...NOTES Pub No 1327 January 2014 15 RITE HITE VBR 600 DOK LOK Installation Manual...

Страница 16: ...and operated within their rated capacities and or specified design parameters and not otherwise abused Periodic lubrication and adjustment is the sole responsibility of the owner This warranty is Rit...

Отзывы: